My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />Ms. Malott has a strong civil engineering background with a water resources <br />and surface runoff focus. Her engineering experience includes hydrology, storm <br />drain design, and hydraulics. Her computer modeling background includes the <br />application of the U.S. Army Corps of Engineers HEC-HMS (Hydraulic Modeling <br />System), HEC-SSP (Statistical Software package), and HEC-RAS (River Analysis <br />Education' <br />Software), Watershed Modeling System (WM'S), Advanced Engineering Software <br />M.S. -Civil Engineering <br />(Hydrology and Water <br />(AES) for hydrologic/hydraulic analysis in Southern California, Water Surface <br />Resources), University of <br />Pressure Gradient (WSPGW) Software, XP-Solutions Storm Water and <br />California at Irvine <br />Wastewater Management Model (XP-SWMM), AutoCAD Civil 3D, and Arc IS. <br />B.S. -Civil Engineering,. <br />She has worked for projects in the County of Los Angeles, County of Orange, and <br />San Bernardino County. The projects she has been involved with are both in the <br />California State <br />private and public sector. In the private sector she worked on projects for <br />University, Long Beach <br />developers including Rancho Mission Viejo and the Irvine Company. Her public <br />Year of TAIT Team <br />sector experience includes working on projects for the County of Orange, the <br />Enlistment <br />City of Rancho Palos Verdes, the City of Chino, the City of Chino Hills, and the <br />2017 <br />City of Santa Ana. She is an out of the box thinker with great energy and a hard <br />working ethic. She has great communication, writing, organizational and <br />T tal Experience <br />leadership skills. <br />10 <br />WQMP/BMP Design for Bristol Street Improvements and Civic Center Street <br />Certifications <br />Improvements, City of Santa Ana, Project Manage./Project Engineer, 20 <br />Professional Engineer, <br />The City of Santa Ana Bristol Street and Civic Center Improvements Water <br />California No. C86581 <br />quality Management Plans (WQMP) Project included the development of a <br />Affiliations <br />Water Quality Best Management Practices (BMP) design, cost benefit analysis, <br />American Society of Civil <br />cost estimates, coordination with the client, and development of construction <br />Engineers (ASCE), OC <br />plans for the BMP's installation. As part of the cost benefit analysis, several <br />YMF <br />alternatives location and solutions for the type and configurations of BMP were <br />analyzed and preliminary design was completed to determine the most optimal <br />solution for the City. After an alternative was selected project design plans for <br />the BMP installation were prepared and proprietary manufacturer detail design <br />and coordination was completed. As part of this project Mrs. Malott served as <br />the Project Manager/Project Engineer, she provided client coordination, <br />scheduling tracking, reviewed internal scheudling and supported the City in a <br />timely manner and under the budget to achieve the project goals.. <br />El .Salvador Park IM ulti purpose Regional Bann, City of Santa Ana, Project <br />Manager, 2020 <br />The City of Santa Ana El Salvador Park Multipurpose Regional Basin Project <br />sought the development and construction of a Regional Infiltration Basin to <br />provide Water Quality Treatment for an 88 acre residential neighborhood in the <br />City of Santa Ana. The purpose of this project was to improve the stormwater <br />it <br />j A — Appendix 1 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.