Laserfiche WebLink
Education <br />BSCivil Engineering, <br />California State <br />Polytechnic University, <br />Pomona <br />Year ofTAIT Team <br />Enlistment <br />2016 <br />Total Experience <br />13 <br />[ertifirations <br />TA1T& Associates, inc, <br />On -Call Water Resources Engineering Services <br />Christopher Engelba~ EE|�T. <br />PROJECT ENsiNo�SITE- WORKIGRAoiNG <br />Chris isanexperienced Project Engineer indesign, approval, and quality control <br />ofresidential and commercial land development aswell aspublic work projects. <br />Hehas expertise |n preparation oftentative tract maps, street, rough grading, <br />erosion control, storm drain, sewer and water, and precise grading plans; <br />hydrology and hydraulic calculations utilizing Civi|'Dand VVSPG; VV[}PWP <br />employing new low impact development methods; coordination with clients, <br />sub-consu|tants,site managers, contractors, and survey crew. Chris technical <br />skills include AutoCAD[ivi| 3D, Water Surface Profile Gradient Software (VVSPG), <br />Civil-D,and Microsoft Project. <br />Balboa Peninsula Alley Reconstruction and Sewer Repair Project, City of <br />Newport Beach, Project Engineer, 2020-Current <br />The Balboa Peninsula Project will extend the existing alley, provide needed <br />additional width, correct existing drainage, provide accessible paths of travel, <br />and repair damaged portions ofthe existing public sewer line. K8r.EoQe|bach's <br />familiarity with the Oty'sstandards along with his knowledge of roadway design <br />and drainage are anasset infacilitating the client's budgetary and scheduling <br />needs. <br />Dana Point Harbor, Project Engimeer,2Q1D��urnent <br />The Dana Point Harbor Project includes the redesign of entire guest experience <br />atthe Harbor. Mr. Enge|bachiothe Project Engineer providing design solutions <br />for the harbor which includes amall new retail and dining area, roadways, <br />parking fields, boater services, aswell asupdated drainage management <br />fad|itiesandwetvti|ihes.K8cEnge|bach'sknow|edgemf[ivi|3D,dreinage. <br />grading and roadway design are providing the client the best possible solutions <br />for their vision ofthe new Dana Point Harbor Experience. <br />Newport Heights Alley and Sewer Replacement Project, [byoYNewport. <br />8eaoh,ProjectEngineer, 2015-2017 <br />Project Engineer for the services onNewport Height Alley and Sewer <br />Replacement Projects. The project limits spanned across anentire <br />neighborhood inthe Oty'scoastal community nfNewport Heights and include a <br />total of3+miles ufalley reconstructions as well asthe review and repair of <br />existing alley sewer and lateral connections. |norder tofacilitate the [hy's <br />budget and timelines, the design project was split intothree phases which <br />required separate design PS&Efor each project, Phase lincluded all sewer main <br />replacements while Phases 2 and 3 included the alley removal and replacements <br />inthe neighborhoods. <br />/ TA/r Appendix �._-' — <br />