Laserfiche WebLink
' -- T _l3 & Associates, Inc, <br />On -Call Water Resources Engineering Services <br />quality discharge to the downstream receiving waters which ultimately is the Newport Beach Bay and to <br />improve the Park parking facilitates for a disadvantage community in the City of Santa Ana. As part of <br />this project Mrs. Malott supported Project Management, and led the team's efforts for the Hydrology, <br />Hydraulics and Water Quality Analysis and Calculations. <br />Dana point Harbor Revitalization, City of Dana Point Harbor, Project Manager, 2013-Present <br />As part of the Dana Point Harbor project team Ms. Malott has provided stormwater technical design for <br />the Master Plan of Drainage for Planning Areas 1 and 2, supported the development of the Hydrology <br />and Hydraulics Basis of Design Report and WQMP for Planning Areas 3 and 4 for the Coastal Commission <br />Project Application. Starting 2020, she has assisted as the Project Manager for the Commercial Core and <br />Marina development portions of the DPH Revitalization Flan. As the Project Manager, Mrs, Malott has <br />overseen the preliminary design of different aspects of the project, and the construction documents <br />design and development for the Phase 2 of the Commercial Core Portion of the DPH Revitalization Plan. <br />Additionally, Mrs. Malott has led a team of 10 Civil Engineering Designers to support the Projects efforts, <br />while maintaining and providing coordination with the client and other subconsultants. Her <br />organizational skills, civil design knowledge and experience, and communication abilities resulted in <br />timely submittals and project reviews to achieve deadlines and project schedule, as well as to maintain <br />project budget goals. <br />Pier G Avenu-- North —'-ewer Line improvement roject, Port & tong Beach, Project Engineer, 201 e <br />201 <br />Task managed the Hydraulics Analysis and Basis of Design Report for the Pier G Avenue North Sewer <br />Line Improvement Project for the Port of Long Beach (PGLB). The project limits spanned approximately <br />1/3 of a mile within The Port's Pier G, and included the review of existing conditions, analysis of <br />tributary areas and hydraulic capacity for the existing system, preliminary design and recommendation <br />for five separate design alternatives which included conventional open trench, pipe bursting, sewer lift <br />stations, sewer force mains, and retrofit of existing sewer lift stations to accommodate the current and <br />future demand peak flow conditions. Mrs. Malott supported all project coordination efforts and was a <br />vital part of the project team. <br />Newport Heights Alley and Sewer Replacement Project, City of Newport Beach, Project Engineer, <br />2016a20177 <br />Mrs. Malott was an Assistant Engineer for the Newport Heights Alley and Sewer Replacement Project. <br />The project included the preparation of design plan and profile for each alley that was repaired, <br />prepared of design cross sections at 25-foot intervals for review of proposed cross falls, preparation of <br />sewer main replacement and lateral replacement plans, field review of all alley locations to field locate <br />existing utilities, conflicts, and join locations, identification of sewer laterals that were recently replaced <br />for protection, and the detailing of all alley approaches for compliance with the Americans with <br />Disabilities Act (ADA). As part of the project team Mrs. Malott provided plan production assistance, alley <br />design, and completed field visits. <br />Appendix 1 32 <br />