My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES, INC. (6)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 7:59:36 AM
Creation date
10/6/2022 10:22:50 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES, INC.
Contract #
A-2022-158-04
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
4/1/2026
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NA- <br />PPPPP <br />WOO <br />` <br />.` <br />�M��[��terReSo�[c�������O��������0/i��� <br />Khnlex-Honnprovided transportation planning and traffic engineering on -call services tothe City om <br />dozens of projectsundarnnuKi-vearcontnsotsvvitbtheCit/oP|amningandEnQineehngDennrtnnenin. <br />Services provided include the preparation of parking studies and traffic studies for private development <br />projects as well as third -party review of parking and traffic studies prepared by others. <br />Year Completed: Ongoing <br />Client Name: City ofAnaheim <br />Contact Information: Rudy Ernarni. Public Works Director, 714.785.5176 <br />Kimn|ey-Horn Project Manager: Jason K4e|ohor, P.E. <br />Santa Ana Boulevard & 5th Street Protected Bike Lane PS&E, <br />Santa Ana, CA <br />Kimley-Horn has completed engineering design aen/ioeo for the Santa Ana Boulevard and 5th Street <br />protected bike lane project for the City ofSanta Ana. The project included two and half miles of <br />protected bike lane facilities along various streets in the Qty's dnvvntuvvn area. This project was one of <br />the first protected bike lane projects ofthis magnitude inOrange County. The project oonsiatedofbike <br />signo|a, pedestrian vvo|kvvay innproxenments, traffic oa|nnin8 features, /\DAinmprovements. signing and <br />striping, and landscape and irrigation design. The project hasinvo|vedextenoive000rdinationduring <br />the design phase with all stakeholders including the Orange County Transportation Authority for the <br />OC Streetcar project within the monne area. <br />The M]mm|ey-Hnnnteam provided the City with <br />alternatives for the design ofthe bike lanes <br />to provide more protection for all modes of <br />transportation including vehicular, pedestrian, <br />and public transit. <br />Year Completed: 2O2O <br />Client Name: City ofSanta Ana <br />Contact Information: Sean Thomas, Senior <br />Civil Engineer, 714.G47.5O55 <br />Kimnley-HornProject &8anager: <br />Darren Adrian, P.E. <br />Kimlev�Hnmisassisting the City ofSanta Ana <br />in transforming their existing South Main Street <br />into arevitalized corridor. The project invo|ves <br />creating solutions for street beautification, <br />traffic sefety, we|hmbi|ity, bike circulation, <br />environmental sustainability, security, and <br />K10|2V,MO0 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.