Laserfiche WebLink
- <br />/ w~ <br />Ut <br />On-'all"Waƒ a[Vic-F-S <br />enhancing streetscape aesthetics with landscape and hardscape features to create a more inviting <br />andp|eesanturbonarea�imnprovinQotnaetvva|hab|epathsvvbhoedestMansofetv curb ramps, <br />crosswalks, and other ADA features; encouraging the use of alternative transportation such as walking, <br />bikinQ, and public transit; improving accessibility to |000| businesses by providing on street parking-, <br />creating a low impact and sustainable design for improvements while considering environmental <br />iaooeo|andenhmncingoorridorsafeh/mndoenuritybyeddinghi0hvisibi|itvorpoovvm|kaendpedeatrien <br />level street lights. <br />Year Completed: Ongoing <br />Client Name: City ofSanta Ana <br />Contact Information: 8uziFujanic.Associate Planner, 714.571A241 <br />k{imm|ey-Horn Project Manager: Darren Adrian, RE. <br />Fisher Park Neighborhood Water Main Improvements, Santa Ana, CA <br />Kimley-Homprovided PS&Eservices for Fisher Park Neighborhood VaterMain|mpmvements that <br />included improving and upgrading approximately 9500 feet of water main and over 200 laterals. <br />Year Completed: 2OZ1 <br />Client Name: City ofSanta Ana <br />Contact Information: GuziFujanio.Associate Planner, 714.571,4241 <br />Ninmley-Horn Project Manager: Darren Adrian, PE. <br />Kimley-Horn is providing PS&E services for Warner Avenue between Wright Street and Oak Street <br />to expand the roadway from two lanes in each direction to three in each direction. Part of this work <br />includes improving and upgrading the surrounding storm drain infrastructure, including e new 6O-|ncb <br />storm drain within Warner Avenue. This involves coordination with multiple stakeholders, including <br />utilities for overhead power lines; industrial, commercial, residential, and City fire and schools directly <br />affected by the vvidening� and OCT4vvho uses both Grand Avenue (a major cross street) and Warner <br />Avenue astransit routes. <br />Year Completed: Ongoing <br />Client Name: City ofSanta Ana <br />Contact Information: Suz|Fogonio.Associate Planner, 714.S71.4241 <br />P(irn|ey-Horn Project Manager: Darren Adrian, PE. <br />K]nnlev-Hornprovided peer review ofthe streetcar design forvariouateohnioa|oreaasuchasheok <br />alignment, grade crossings, stations, signalization, OCS, TPSS, constructability, basic operations, <br />and overall coordination of the proposed corridor with bicycles, pedestrians, buses and other vehicles. <br />TheOC Streetcar will increase transportation options and provide greater access to a 4.15-mile route <br />along Santa Ana Bou[evard, 4th Otneet, and the Pacific Electric right-of-way to Harbor Boulevard <br />|nGarden Grove. <br />Year Completed: 2O19 <br />Client Name: City ofSanta Ana <br />Contact Information- Jason Gabriel, Principal Civil Engineer, 714.847.5884 <br />k{inm|ey-HornProject RNmnm8er:DarrgnAdrian.P.E. <br />Kim <br />' . * Horn 18 <br />