My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENGINEERING SOLUTIONS SERVICES, INC. (2)
Clerk
>
Contracts / Agreements
>
E
>
ENGINEERING SOLUTIONS SERVICES, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:03:37 AM
Creation date
10/11/2022 4:21:32 PM
Metadata
Fields
Template:
Contracts
Company Name
ENGINEERING SOLUTIONS SERVICES, INC.
Contract #
A-2022-185-02
Agency
Public Works
Council Approval Date
9/20/2022
Expiration Date
9/19/2025
Insurance Exp Date
5/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q0 <br />Proposal to Provide Water Sewer, and Public Works Grant Writing g Services <br />reservoir at the County Sanitation Districts of Los Angeles County Whittier Narrows Water <br />Reclamation Plant and approximately 18,000 linear feet of pipeline. <br />City of Industry Water Recycling Project Phase IIB-Pipeline, Reservoirs and Pump Station <br />Project Manager responsible for the expansion of the Upper San Gabriel Valley Municipal Water <br />District's recycled water system. The facilities for the project include a two pump station, two <br />reservoirs in the City of West Covina and 24,000 linear feet of pipeline. <br />City of Industry- Recycled Water Pump Station No. 1 <br />Senior Manager responsible for the preliminary design expansion of the Recycled Water Pump <br />Station No. 1 located at San Jose Creek Water Reclamation Plant. The facilities included <br />hydraulic modeling, structural, electrical and civil/mechanical improvements. <br />Terminal Island Treatment Plant Evaluation, City of Los Angeles Bureau of Engineering <br />Project Engineer responsible for the evaluation of the viability of operation of the Terminal <br />Island Treatment Plant. Recycled water evaluation leader with the project including conducting <br />a series of public workshops with interested stakeholders to evaluate the TITP facility with <br />regards to costs, operation, and long-term compliance with future treatment options and <br />permitting requirements. <br />Program Management, San Jose Creek Water Reclamation Facility Feasibility Report, <br />Upper San Gabriel Valley Municipal Water District Project Manager responsible for the <br />evaluation of multiple technologies, including microfiltration, reverse osmosis, and UV for <br />further treatment of Title 22 recycled water for discharge to the San Gabriel River. The advance <br />wastewater treatment evaluation including evaluation of pollution prevention program and <br />layout of a 12-MGD facility on limited space at the San Jose Water Reclamation Facility. <br />RP-1 Modifications, Inland Empire Utilities Agency Responsible for the RP-1 Dechlorination <br />and Solids Process Upgrades Project as well as the Asset Management Project. The work <br />encompasses conceptual design, detailed design, specifications, drawings and office <br />engineering. The dechlorination station requires capacity expansion for the planned increased <br />in wastewater reuse. The digester gas handling facilities will be expanded to 1300 scfm for <br />improved hydrogen sulfide, humidity, VOC and siloxane removal. Gas handling upgrades will <br />also include a 20,000 cubic foot digester gas holder and ultra -low emissions gas flare. Filtrate <br />from the dewatering building will also be equalized for better flow management. <br />City of Rialto WWTP No. 5 Expansion, Chevron Energy Solution As the Principal in Charge <br />for the City of Rialto WWTP No. 5 Expansion which is increasing from 6 MGD to 12 MGD <br />including one primary, two aeration basins, two secondary and full integration with the existing <br />facility. Responsibilities include project management, supervision of design, client coordination, <br />meeting attendance. <br />6-Inch Export Sludge Force Main Replacement, South Coast Water District/Aliso Water <br />Management Association Project Engineer responsible for the design of approximately seven <br />miles of 6-inch primary sludge force main in an environmentally sensitive regional park and City <br />of Laguna Niguel Park. The design involved two creek crossings, a minor highway crossing, <br />interface with the existing plant facilities, civil grading, and pigging equipment modification. <br />Project Manager, Biosolids Strategic Plan, South Orange County Wastewater Authority, <br />CA Developed a biosolids management strategy utilizing current findings on disposal and <br />composting alternatives, including consideration of local facilities totally for SOCWA and <br />opportunities with other local agencies. <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.