Laserfiche WebLink
6 <br />Proposal to Provide Water, Sewer, and Public Works Grant Writing Services <br />Carlos Pineda, PE, Senior Civil Engineer <br />Carlos is a registered civil engineer in the State of California <br />with over 38 years of experience in civil engineering and <br />project management. He has extensive experience working for <br />both private and public sectors. His private sector design <br />experience covers a wide range of projects including <br />residential master planned communities and "in tract' <br />residential improvements. His public works design experience <br />covers a wide variety of projects including the improvement of <br />major arterials, secondary highways and collectors, flood <br />control and drainage projects, ADA retrofit, and safe routes to <br />school projects. <br />Relevant Experience <br />Trail Restoration Project, City of Huntington Beach, CA <br />Carlos has been responsible for successful development of a <br />conceptual plan for the Shipley Park trail project that met the <br />approval of the Parks Board members. Carlos then prepared <br />the application for the California Department of Parks and <br />Recreation <br />Linear Park and Trail, City of Seal Beach, CA <br />Responsible for development of a grant application for <br />development of a linear park to achieve trail connectivity that <br />included research and preparation of the narrative and all the <br />Clean CA Grant requirement for the Project. <br />Park Expansion Project, City of Sacramento, CA <br />Responsible for development of a conceptual plan and preparation of the narrative and all the <br />Clean CA Grant requirement for the Project. <br />Landscaping Restoration, City of Seal Beach, CA <br />Preparation of a grant application package for the median landscape retrofit for the City of Seal <br />Beach for conformity with Caltrans requirements and City General Plan. . <br />Recycling Water Projects, Central Basin Municipal Water District, CA <br />Responsible for preparation of 3 application packages for cities of Downey, Southgate and Bell <br />Gardens. Developed cost estimate and the grant application for submittal on behalf o the agency. <br />LOSSAN Corridor, Peer Review, Hydrology & Hydraulics, San Diego, CA <br />As part of RailPros Team, Carlos has been providing peer review on Civil engineering plans for <br />several portions of the LOSSAN Corridor project. <br />Metro- Metrolink Station Location Studies, Los Angeles, CA <br />ESS served as a sub consultant and provided site study and study the utility constraints involved. <br />This study included four stations and multiple alternatives for each location. The utility study <br />included coordination with various stakeholders such as cities, and SCE. <br />35 <br />