Laserfiche WebLink
C MNS <br />HSIP Cycle 10 Grant Application, Madison Street <br />Intersections Pedestrian Safety Improvements, <br />Stockton, CA. Project Manager. MNS in an on -call grant <br />writing services provider to Stockton. Mr. Jaquez <br />prepared a HSIP Cycle 10 grant application including <br />preliminary engineering, scoping, and cost estimation. <br />The City was awarded a grant of $645K. <br />Proposition 1 Stormwater Grant, Valley Village Park <br />Stormwater Project, City of Los Angeles Department <br />of Water and Power (LADWP), CA. Grant Writing <br />Manager. MNS prepared a Proposition 1 Stormwater <br />Implementation Grant application for the Valley Village <br />Park Stormwater Project. To minimize the region's <br />dependence on imported water, the project will capture <br />158 AFY of runoff from a 453-acre tributary area and <br />recharge the San Fernando Valley Groundwater Basin. <br />The project consists of installing a 0.65-acre <br />underground infiltration gallery at Valley Village Park. <br />Construction of the underground infiltration gallery <br />includes installation of a storm drain diversion structure, <br />stormwater pipeline, two hydrodynamic separator (HDS) <br />units, flow measuring devices, and maintenance holes. <br />Grant secured $6M. <br />Proposition 1 Groundwater Grant, City of Los <br />Angeles Department of Water and Power (LADWP), <br />CA. ProjectManager/QA/QC. MNS prepared a Title XVI <br />Feasibility Study for the Downtown LA Recycled Water <br />Project. The MNS grants team completed two <br />Proposition 1 Groundwater Sustainability Program <br />applications for two sub -elements of the San Fernando <br />Basin Remediation Project. <br />Safe, Clean Water Program, Cities of San Gabriel, <br />Glendora, and La Canada Flintridge, CA. Grant Writing <br />Manager. For each of these three cities, MNS advised on <br />recommending the respective project pursuits, developed <br />the general project scopes, prepared the funding <br />application to the Safe, Clean Water (SCW) program, <br />and represented the cities as presenter and <br />spokesperson to the respective SCW Steering <br />Committees. The cities were granted $900K. <br />ATP Cycle 3, City of Buellton, CA. Grant Writer. As part <br />of a grant writing team, Greg prepared an application <br />which secured funding for a school pedestrian safety <br />improvement project. MNS also provided preliminary <br />engineering and design services. <br />Clean Water State Revolving Fund Grant, Los Olivos <br />Community Services District, CA. Project <br />Manager/QA/QC. MNS developed a Plan of Study for a <br />Project Report following the guidelines of the Clean <br />Greg Jaquez, PE ) RESUME PG 2 <br />Water State Revolving Fund (CWSRF) and the Water <br />Recycling Funding Program (WRFP). The Project Report <br />will determine the feasibility and selected alternative for a <br />wastewater collection system, wastewater treatment <br />plant, and groundwater replenishment injection well <br />system for the Los Olivos Community Services District <br />(LOCSD). The unincorporated Los Olivos community in <br />Santa Barbara County manages its wastewater with <br />onsite wastewater treatment systems (septic tanks) on <br />private parcels. LOCSD was seeking to develop a <br />comprehensive wastewater collection and treatment <br />system with provision for beneficial use of its treated <br />wastewater. The Plan of Study was submitted with a <br />WRFP application to the State Water Resources Control <br />Board. <br />HSIP Cycle 7, City of Pittsburg, CA. Grant Writer. As <br />part of a grant writing team, Greg prepared an application <br />which secured funding for various safety <br />countermeasures on Leland Road which had a high <br />incidence of collisions. The grant writing project also <br />included analysis of SWITRS collision data with the TIM <br />mapping system and development of a set of <br />countermeasures to reduce or eliminate the frequency of <br />certain types of collisions. <br />Clean Water SRF Grant, Castroville Community <br />Services District, CA. Project Manager/QA/QC MNS <br />provided technical and grant writing services for the <br />Washington Street Sewer Bypass project. Once <br />completed, the project will eliminate surcharge issues in <br />the existing sewer line and provide additional sewer <br />capacity for much needed housing development. <br />Federal Lands Access Program Grant, Thornton <br />Avenue Cycle Track, City of Newark, CA. Grant <br />Writing Manager. MNS prepared a FLAP Grant <br />application for the Thornton Avenue Cycle Track Project. <br />Greg defined the project concept, prepared a conceptual <br />plan layout, and prepared a preliminary cost estimate. <br />The MNS grants team also conducted public outreach. <br />The application resulted in a grant award of $5.4M. <br />Proposition 68 Statewide Park Program, City of <br />Soledad, CA. Grant Writing Manager. MNS prepared the <br />grant application and provided public outreach support <br />for the new Hartnell Park Project. MNS prepared public <br />outreach support materials such as participant <br />involvement exercises, concept sketches, and meeting <br />documents. As the process progressed, MNS provided <br />concept development designs and cost estimates in <br />conjunction with the City's contracted landscape <br />architect. The grant secured $7.6M. <br />APPENDIX B. RESUMES <br />