Laserfiche WebLink
2. Scope of Services and Schedule <br />It is anticipated that this meeting will be held at a planned City meeting or planned event from a local group. <br />PlaceWorks will present the Schematic Design Alternatives and gather input on community preference. <br />While the structure of the meeting may be adjusted based on the anticipated venue and audience, <br />we anticipate that this meeting could begin `open house" style with informational boards illustrating the <br />design, followed by a short presentation by PlaceWorks, and an opportunity for public comment. <br />Depending on the venue, PlaceWorks can develop materials for youth to participate in decision making. <br />All input will be collected and synthesized into a concise, easy -to -understand summary of input received <br />and will be used in the next design phase. <br />4.8 REVISED DESIGN DEVELOPMENT (30% DRAWINGS AND COST ESTIMATE) <br />Based on City review comments and public input, the PlaceWorks team will revise the Draft Design <br />Development Plan. This draftwill be used in discussions and for preliminary letters of intentwith Southern <br />California Edison (SCE) and City of Santa Ana Water Resources Division. <br />The revised Design Development package will include preliminary working drawings to 30% and will be <br />accompanied by a cost estimate. The package will include the following preliminary plan sheets: <br />■ Title Sheet and Location Map <br />■ Demolition Plan <br />■ Water Quality Management Plan (tentative) <br />• Grading, Drainage, and Utility Plan <br />E Layout Plan <br />■ Materials Plan <br />■ Electrical Plan <br />• Planting Plan and Hydrozone Irrigation Calculations <br />4.9 CITY STAFF MEETING #5: PREPARING FOR FINAL DESIGN <br />Following a four -week review period, PlaceWorks will facilitate a City staff meeting to review the 30%ff <br />drawings and conduct a site walk with to review the drawings in the field and deliberate on areas where <br />there are questions or potential impacts. <br />TASK 5. UTILITY COORDINATION <br />5.1 SOUTHERN CALIFORNIA EDISON (SCE) <br />PBS Engineers will coordinate with SCE early in the design process to determine electrical capacity <br />requirements and service needs. In tandem with the 30% submittal, PBS Engineers will submit a Letter of <br />Intent to begin the process for SCE electrical plan of service and all permits. PBS Engineers will update <br />plans as needed to respond to SCE's request and will finalize the plan of service and all associated <br />permits as part of this project. It is assumed that the City will pay associated permitting fees. <br />5.2 CITY OF SANTA ANA WATER RESOURCES <br />BKF will coordinate early in the design process with Water Resources to verify available water pressures <br />and volumes and to determine water service needs and capacity requirements. In tandem with the 30% <br />submittal, BKF will provide additional detail about the project including water needs for the irrigation and <br />potable water features and initiate the Water Resources service plan process. BKF will finalize the plan <br />of service and include it as part of the final construction documents. <br />2-4 CITY of SANTA ANA I NEW OUTDOOR LIBRARY AT JEROME PARK DESIGN SERVICES <br />