Laserfiche WebLink
2. Scope of Services and Schedule <br />TASK 6. CONSTRUCTION DOCUMENTS <br />6.1 90% PS+E SUBMITTAL <br />Based on the City's Comments and the Field Walk to review the Revised Design Development plan (30% <br />Drawings), the PlaceWorks team will develop the 90% PS+E submittal for the project. The preliminary <br />list and count of the construction document sheet set is anticipated to include approximately 30 to 35 <br />sheets listed in Table 1. We believe that, for the purpose of clarity, construction document plans are best <br />prepared at 1:20 scale. <br />Table 1 Preliminary Construction Document Sheets (90%, 100%, Final Set) <br />Sheet Title <br />Responsibility <br />Sheets <br />Title Sheet and Location Map <br />PlaceWorks <br />1 <br />Notes, Legend and Abbreviations <br />PlaceWorks <br />1 <br />Existing Conditions /BASE @ 1:20 <br />BKF <br />1 <br />Water Quality Management Plan (WQMP) <br />BKF <br />1 <br />Demolition Plans @ 1:20 <br />BKF <br />1 <br />Civil Construction Details <br />BKF <br />3 <br />Grading & Drainage Plans @1:20 <br />BKF <br />1 <br />Layout Plan <br />PlaceWorks <br />1 <br />Sewer and Water (wet) Utility Plans <br />BKF <br />1 <br />Materials Plan @1:20 <br />PlaceWorks <br />1 <br />Landscape Details <br />PlaceWorks <br />6 <br />Electrical Plans @1:20 <br />PBS Engineers <br />1 <br />Electrical Details <br />PBS Engineers <br />4 <br />Irrigation Plans @1:20 <br />WELO Calcs & Submittals <br />Sweeney +Associates <br />1 <br />Irrigation Details <br />Sweeney +Associates <br />4 <br />Planting Plan @1:20 <br />PlaceWorks <br />1 <br />Planting Details <br />PlaceWorks <br />2 <br />The 90% plans will be accompanied by draft specifications in CSI format. The cost estimate will be <br />developed using the City's preferred schedule -of -values format or other bid -form -ready template. <br />PlaceWorks will also develop a 3d rendering of the proposed improvements as part of this submittal, but <br />it will not be included in the draft plans. <br />6.2 CITY STAFF MEETING #5: 90% PS+E AND CONSTRUCTABLITY REVIEW <br />Following a four -week review period, City staff will provide PlaceWorks with one set of marked up plans <br />and specifications. PlaceWorks will meet with City staff to review comments on the 90% set, clarify <br />any questions that may arise, and address constructability. The project team will conduct a site walk to <br />address any remaining issues. <br />6.3 100% PS+E SUBMITTAL <br />Based on City review comments, the PlaceWorks team will revise the 90% submittal and refine it to <br />100%. <br />PROPOSAL FOR SERVICES I PLACEWORKS 2-5 <br />