My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP (4)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:16:15 AM
Creation date
11/7/2022 3:49:34 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2022-193
Agency
Public Works
Council Approval Date
10/4/2022
Expiration Date
10/3/2025
Insurance Exp Date
5/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final plans shall be provided in AutoCAD or Microstation format, and .pdf format. <br />Task l: Pre -Design <br />Preliminary design shall include Kick-off meeting with City Staff (representatives from Public Works Agency, <br />Risk Management, Recreation, and the City Manager's Office) to discuss scope of work, project goals and <br />objectives, potential elements and issues, schedule, review of existing information and site investigation. <br />➢ Deliverables shall include a Work Task Plan, Schedule, Geotechnical Report and Site Survey. <br />Task 2: Concept Design <br />Concept design shall include up to three (3) meetings with City Staff to brainstorm and review potential layouts. <br />Additionally, outreach shall be conducted in up to three (3) public meetings to provide the community an <br />opportunity to review the concept designs and provide input. Please provide creative methods used to engage <br />the community on needs and priorities while keeping the project on schedule. i.e. workshops, online polls. <br />➢ Deliverables shall include up to three (3) schematic concept designs, with a minimum of four (4) <br />perspective drawings/renderings for each the following: overlooking the plaza from Civic Center <br />Plaza, plaza leading to the new restrooms, breezeway leading to Council Chambers, new restrooms <br />outside of Council Chambers, and tenant improvement of the existing restrooms inside the Council <br />Chambers. <br />➢ Final Concept shall be approved by City Staff <br />Task 3: Design Development (50% plans) <br />Design development will involve the schematic development of plans based on the approved conceptual design <br />plan, which shall include but is not limited to survey, civil design, geotechnical investigation and report (for <br />soils analysis), infiltration testing, architectural design, landscape architectural design, structural design, interior <br />design, furniture selection, electrical engineering, mechanical and plumbing engineering, draft technical <br />specifications and "opinion of estimated cost'. <br />➢ Deliverables shall include a 50% set of plans, including site section studies, draft specification, <br />"Opinion of Probable Cost". <br />Task 4: Construction Documents (90% and 100% plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design Development <br />phase. This includes the provision of detailed engineering and construction drawings that will serve as the basis <br />for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final technical <br />specifications, finalized "Opinion of Probable Cost". 100% plans will go through a constructability <br />review that could lead to comments and recommendations that should also be addressed and completed <br />as part of this deliverable. <br />Plans. Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />City of Santa Ana RFP 22-062 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.