My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 9:52:59 AM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • CITY OF SANTA ANA <br /> ti ❑h�rtA4 <br /> ' PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> `F , o` <br /> Project Number Project No. 18-6491 Well No. 29 Improvements Change Order Number 005 <br /> To Environmental Construction, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by CITY OF SANTA ANA <br /> EXTRA WORK AT AGREED PRICE <br /> 1. This Change Order Number 005, Item A (5A) provides additional compensation to the <br /> Contractor for work completed on a Time and Materials (T&M) cost basis per Section 2-8 "Extra <br /> Work" and Section 7-4 "Payment for Extra Work" of the Standard Specifications and General <br /> Provisions of the contract. The extra work is described in the following: Change Order Request: <br /> 12 MWD Pothole for Blow Off($4,058.53), Change Order Request: Additional Concrete Demo <br /> Under Tennis Court Slab Per RFI Response#051 ($9,187.95), Change Order Request: 20 Inch <br /> Abandon Pipe Spillage & Cap ($10,929.5), Change Order Request: 10 Inch Abandon Well Pipe <br /> Cap ($14,811.75), and Change Order Request: Contaminated Soil Under Vault ($21,624.90). <br /> The cost of Change Order Number 005, Item A is sixty thousand, six hundred twelve and <br /> 71/100 dollars ($60,612.71). Twelve (12) additional working days are added as part of this <br /> Change Order Number 005, Item A. <br /> CHANGE ORDER NUMBER 005, ITEM A COST: $60,612.71 <br /> 2. This Change Order Number 005, Item B (5B) provides additional compensation to the <br /> Contractor for the City directed change per Plan Clarification No. 02, Cost Request Bulletin No. <br /> 03, and Change Order Request No. 07; and shall be paid at agreed price in accordance with <br /> Section 7-3.7 "Agreed Price" of the Standard Plans for Public Works Construction. <br /> Work of this change order to include: <br /> • Installation and Integration of City provided 14" magnetic flow meter (FE-102) into the <br /> PLC/HMI. <br /> • 'Installation and Integration of City provided totalizer(FIT-102) into the PLC/HMI. <br /> • All integration submittals and shop drawings associated with this change. <br /> • All start-up testing and commissioning associated with this change. <br /> • All conduits, conductors, and terminations associated with this change. <br /> The total cost of Change Order Number 005, Item B is nine thousand, eight hundred fifty and <br /> 33/100 dollars ($9,850.33). No additional working days are added as part of this Change Order, <br /> Item B. <br /> CHANGE ORDER NUMBER 005, ITEM B COST: $9,850.33 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.