My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 9:52:59 AM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. This Change Order Number 005, Item C (5C) provides additional compensation to the <br /> Contractor for the additional hours required to complete mechanical redevelopment of the well <br /> as directed by the engineer and in accordance with Section 7-3.5 "Contract Unit Prices" of the <br /> Standard Specifications for Public Works Construction. <br /> The total cost of Change Order Number 005, Item C is twenty-four thousand, six hundred <br /> twenty-six and 70/100 dollars ($24,626.70). Four (4) additional working days are added as part <br /> of this Change Order 005, Item C. <br /> • Bid Item No. A8— Perform mechanical redevelopment of well $782/hr. <br /> • Contract Change Order No.02 - Item No. A8— Perform mechanical <br /> redevelopment of well $38.89/hr. <br /> Total Unit Cost $820.89/hr. <br /> 30 additional hours @ $820.89/hr= $24,626.70 <br /> CHANGE ORDER NUMBER 005, ITEM C COST: $24,626.70 <br /> 4. This Change Order Number 005, Item D (5D) provides additional compensation to the <br /> Contractor to procure and install "Cyberlock" door cylinders in place of hardware specified in <br /> Section 08 71 00 "Door Hardware" of the project technical specifications. Work to be paid at <br /> agreed price in accordance with Section 7-3.7- "Agreed Price" of the Standard Specifications <br /> for Public Works Construction. <br /> The total cost of Change Order Number 005, Item D is one thousand three hundred forty-seven <br /> and 29/100 dollars ($1,347.29). No additional working days are added as part of this Change <br /> Order, Item D. <br /> CHANGE ORDER NUMBER 005, ITEM D COST: $1,347.29 <br /> CHANGE ORDER NUMBER 005 GRAND TOTAL: $96,437.03 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.