My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIG, INC. (2)
Clerk
>
Contracts / Agreements
>
M
>
MIG, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:24:48 AM
Creation date
12/22/2022 2:59:37 PM
Metadata
Fields
Template:
Contracts
Company Name
MIG, INC.
Contract #
A-2022-235
Agency
Public Works
Council Approval Date
12/6/2022
Expiration Date
12/5/2025
Insurance Exp Date
8/31/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. PRELIMINARY DESIGN. The consultant shall organize a kick-off meeting with City staff to <br />discuss the conceptual design plan, project goals and objectives, potential elements and issues, project <br />schedule, review of existing information, and conduction of a site investigation. <br />F. SURVEY. On -the -ground field topographical survey work is to be determined by the Consultant <br />(and/or the Consultant's Subconsultant) if any existing horizontal and vertical features are needed for <br />the project. It is the Consultant's responsibility to provide only the survey necessary for the design of <br />the project components identified within this RFP. Consultant shall identify in the proposal a detail list <br />of features the survey would include. Design level survey and base mapping of the project site shall be <br />prepared in US Customary English units by a California licensed Land Surveyor in accordance with <br />the City guidelines and in Microstation CONNECT Computer Aided design and Drafting (CADD) <br />format. The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. <br />G. WATER QUALITY. The Consultant shall coordinate with the City for the Low Impact Development <br />(LID) requirements of the project and prepare a Water Quality Management Plan (WQMP) if deemed <br />required. Consultant shall provide BMPs with appropriate size based on treatment and peak flow rates, <br />freight to job site and one year of maintenance to include units and cost in the engineer's cost estimate. <br />The selection of Best Management Practices (BMPs) will always be subject to site specific conditions <br />and the Consultant will be required to perform the research into the site specific conditions (e.g. prior <br />contamination, depth to groundwater, soil conditions, interfering utilities, etc.) that could preclude <br />infiltration. The Consultant shall also perform the required soils and/or infiltration testing per the <br />Technical Guidance Documents, as necessary to design the infiltration system assuming it is the <br />selected LID approach. <br />Please find information and links to relevant documents and regulations at the following site: <br />http://ocwatersheds.com/documents/wqmp. <br />H. PUBLIC OUTREACH. The Consultant shall be available for a minimum of 2 public outreach <br />meetings to present the project to the community. One community meeting is to be used as a workshop <br />for the community to participate in the naming of the park and in the design of the 2 dog sculptures. <br />The second community meeting will be to share the top dog park names and to showcase the dog <br />sculpture designs that were created from their input. The Consultant will be responsible for organizing, <br />promoting and facilitating these meetings and will provide all presentation material, graphics, <br />rendering (up to 2) and any other printed materials. The meeting will serve to discuss key project <br />aspects, benefits to the community, and consequences of the project, gain input from local residents <br />on design or aesthetic features of the project. The City will assist in providing available meeting spaces <br />by coordinating with City facilities. <br />I. UTILITY COORDINATION. The Consultant shall be responsible for all utility coordination efforts, <br />including but not limited to; coordination with Edison for any electrical service connections, and water <br />service connections for irrigation and water fountains. <br />J. PLANS, SPECIFICATIONS AND ESTIMATES (PS&E) <br />o Development of Plans, Specifications and Estimate (PS&E): <br />a) All reports, plans, specifications and quantity calculations shall conform to criteria, <br />policies, procedures and standards of the City. The Consultant shall use the boilerplate <br />for cut sheets, specifications and estimates provided by the City. <br />b) The plan development shall include three (3) milestone deliverables-30%, 60%, 90% <br />(pre -final) and 100% (final). All plan sheets shall be prepared at a reasonable standard <br />City of Santa Ana RFP 22-129 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.