Laserfiche WebLink
scale to be noted on plans. The necessary plans for each PS&E package shall include, but <br />are not be limited to: <br />Task 1: Design Development (30% plans) <br />Design development will involve the schematic development of plans based on the approved conceptual design <br />plan, which shall include but is not limited to survey, civil design, geotechnical investigation and report (for <br />soils analysis), infiltration testing, architectural design, landscape architectural design, structural design, interior <br />design, furniture selection, electrical engineering, mechanical and plumbing engineering, draft technical <br />specifications and "opinion of estimated cost'. <br />➢ Deliverables shall include a 30% set of plans, including site section studies, draft specification, <br />"Opinion of Probable Cost". <br />Task 2: Construction Documents (60% 90% and 100% plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design Development <br />phase. This includes the provision of detailed engineering and construction drawings that will serve as the basis <br />for both bidding and construction by a general contractor. Deliverables shall also include final colored concept <br />plan and colored renderings illustrating the improvements per the final plans. Final construction documents <br />must be completed in time to advertise the project by August 2023. <br />➢ Deliverables shall include 60%, 90% and 100% plans, structural calculations, final technical <br />specifications, finalized "Opinion of Probable Cost". 100% plans will go through a constructability <br />review that could lead to comments and recommendations that should also be addressed and completed <br />as part of this deliverable. <br />Plans: Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans And Details (including plumbing) <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />o Demolition Plans <br />o Construction Plans <br />o Signage Plans <br />o Reflected Ceiling Plans <br />o Exterior Elevations <br />o Interior Elevations <br />o Mechanical and Plumbing Plans/T-24 <br />o Electrical Plans, as applicable <br />o Architectural Details <br />o Structural Calculations <br />o Door/Window/Pinish Schedules, as applicable <br />o ADA Path of Travel design and/or Signage Plan <br />City of Santa Ana RFP 22-129 <br />Page Al-5 <br />