My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Clerk
>
Contracts / Agreements
>
B
>
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2022 9:04:22 AM
Creation date
12/29/2022 9:03:18 AM
Metadata
Fields
Template:
Contracts
Company Name
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Contract #
N-2022-376
Agency
Public Works
Expiration Date
12/18/2025
Insurance Exp Date
11/20/2023
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ARCHITECTURAL SERVICES <br />PAAL CENTER ADA RE, STROOM UPGRADES <br />RFP NO.22-104 <br />INTRODUCTIONBACKGROUND <br />The project proposes to rehabilitate the restrooms located within the Police Athletic and Activities <br />League (PAAL) Community Center, which is located at 2627 West McFadden Avenue, Santa <br />Ana, California. The project would remove architectural barriers that restrict access to those with <br />disabilities and improve the existing restrooms within the community center to comply with the <br />Americans with Disabilities act of 1990. In total, the project would rehabilitate four restrooms <br />(two male and two female) consisting of removing existing plumbing fixtures , installing new <br />fixtures with appropriate spacing , and updating the restrooms to provide an accessible path of <br />travel to enter and exit the restrooms. The PAAL community center was built in 1970. Project - <br />related physical changers would be limited to the interior of the PAAL Community Center and <br />more specifically to the four restrooms proposed for rehabilitation. There are no proposed <br />improvements to other interior spaces (such as lobbies or gathering spaces) and there would be <br />no alterations made to the exterior of the PAAL Community Center. <br />The facility needs its restrooms to be upgraded to be fully compliant with current Federal and <br />State Regulations as they pertain to the American's with Disabilities Act (ADA). This includes <br />the Federal "2010 ADA Standards for Accessible Design" as written by the U.S. Department of <br />Justice, and the 2013 California Building Code (Title 24, Part 2, of the California Code of <br />Regulations.) <br />An ADA compliance survey was completed by the City in May 2022. The City is seeking an <br />Architectural firm to take the findings from this survey and prepare Contract Documents to <br />address the deficiencies so the project can be competitively bid for construction. Depending on <br />the budget and estimated costs, the city would need to phase the work. Once 60 % documents are <br />completed, the city intends to pursue Community Development Block Grant (CDBG) funding. <br />The Scope of Work area includes, but is not limited to, the complete interior of the facility <br />restrooms. <br />Consultant Responsibilities: <br />The Consultant's responsibilities shall consist of the following project tasks: <br />City of Santa Ana RFP 22-104 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.