My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Clerk
>
Contracts / Agreements
>
B
>
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2022 9:04:22 AM
Creation date
12/29/2022 9:03:18 AM
Metadata
Fields
Template:
Contracts
Company Name
BLACK O'DOWD & ASSOCIATES, INC. dba BOA ARCHITECTURE
Contract #
N-2022-376
Agency
Public Works
Expiration Date
12/18/2025
Insurance Exp Date
11/20/2023
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We have reviewed the Scope of Work of the project in the RFP and completed a walk thru of <br />your facilities, and we thoroughly understand your project. BOA will provide Architectural and <br />Engineering services for the ADA Improvements to your restrooms at your PAAL Center. The <br />following is our project understanding. <br />The scope of our work will be to renovate the existing pair of children's restrooms (boys and <br />girls), existing men's and women's restroom and single occupant staff restroom. Our goal for this <br />project is not to decrease the number of plumbing fixtures as it is often the case with restroom <br />ADA Compliance due to the required space needs and clearances. We pride ourselves in being <br />problem solvers and thinking "outside the box" to save our client money. In many of our past ADA <br />Compliance projects, we have been able to maintain the same the number of plumbing fixtures <br />with minimal wall reconfiguration. This has proven to be a plus for our clients, especially in facilities <br />that serve large gatherings and host special events. We will also replace restroom signage with <br />new ADA Compliant signage that will be compatible will the building signage for visual access. <br />We will make sure that your facilities meet your commitment to aesthetic, patron safety, ease of <br />maintenance use -ability, and meet your future accessibility needs. We also understand that your <br />budget for construction is very tight. We will make sure your dollars are spent wisely and our <br />product is "value added". <br />Anticipated Approach: <br />• We will renovate all five restrooms for ADA compliance. The renovation of these restrooms <br />may involve removing adjacent walls and cabinets to provide ADA clearances. We will work to <br />limit the scope of work to the existing walls of the restroom as much as possible and make an <br />effort to not change the structure of the building. <br />• Renovation of all the restrooms will include new plumbing fixtures, accessories, exhaust vent <br />covers/grilles, new sink counters at all restrooms, new lighting fixtures, new floor, wall and <br />ceiling finishes. <br />Tasks Necessary for Successful Completion: <br />• Conduct ADA compliance site survey to verify existing conditions and field measurements <br />• Verify scope with City and Facilty Staff <br />• Interview maintenance staff for facility needs, and product and material preferences <br />• Provide drawings at the Schematic Design Phase to verify scope and restroom layouts <br />• Provide drawings for review and feedback at 50%, 90% and 100% construction documents <br />Deliverables: <br />• Atthe 50%, 90% and 100% Construction Document Submissions, BOAwill provide documents <br />suitable for public bidding and construction <br />• Drawings will include, floor plans, enlarged restroom plans, interior elevations, sections, and <br />details <br />• Project CSI technical specifications. City shall provide "boiler plate" <br />• Opinion of Probable Cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.