My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHARLES KING COMPANY (2)
Clerk
>
Contracts / Agreements
>
C
>
CHARLES KING COMPANY (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 11:50:25 AM
Creation date
2/28/2023 11:49:53 AM
Metadata
Fields
Template:
Contracts
Company Name
CHARLES KING COMPANY
Contract #
N-2023-048
Agency
Public Works
Expiration Date
2/28/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Best Management Practices and Clean Up. At its sole cost, Licensee shall clean up <br />and install, implement, and maintain Best Management Practices (BMPs) at the License Area as <br />outlined below. <br />Within seven (7) days of occupying the License Area, the Licensee shall: <br />(a) Remove old and/or damaged sediment control BMPs from the License Area <br />and install new sediment control BMPs along the entire perimeter of the License <br />Area. Appropriate sediment control BMPs include straw wattle, gravel bag <br />berm, or silt fence, Licensee shall install sediment control BMPs per the SE-5, <br />SE-6, or SE-1 details provided in the California Stormwater Quality <br />Association (CASQA) Stormwater BMP Handbook for Construction. <br />(b) Install tracking_ control BMPs at the vehicle access point to the, License Area. <br />Licensee shall install tracking control BMPs per the TC-1 detail provided in the <br />California Stormwater Quality Association (CASQA) Stormwater BMP <br />Handbook for Construction. <br />(c) Install a fence, if required, and Green Screen. <br />Throughout the duration of the License Agreement, the Licensee shall: <br />a) Cover all stockpiles that are not actively being used or scheduled to be used <br />within a seven (7) day period. Additionally, all stockpiles shall be covered <br />prior to the onset of precipitation. Licensee shall ensure that stockpile <br />coverings are installed securely to protect from wind and rain, Licensee shall <br />only be allowed to stockpile construction materials or sediment that is directly <br />related to their City of Santa Ana Capital Improvement Project. <br />b) Maintain effective Tracking control BMPs to prevent off -site sediment <br />tracking from the License Area. <br />c) Maintain effective Sediment control BMPs along the entire perimeter of the <br />License Area, at all adjacent storm drain inlets, and on all non -active slopes, <br />as appropriate. <br />d) Sweep the street, sidewalk, and parkway adjacent to the License Area at the <br />end of the! working day and prior to forecasted rain events. <br />e) Use a dumpster or appropriate waste receptacle to discard of all trash and debris. <br />Dumpsters and waste receptacles shall be covered prior to the . onset of <br />precipitation. <br />f) Implement Wind Erosion Control BMPs (dust control), as appropriate, per the <br />WE-1 detail provided in the California Stormwater Quality Association <br />(CASQA) Stormwater BMP Handbook for Construction, <br />g) Remove graffiti on the fence or green screen within one (1) day of notification <br />by the City. <br />h) Repair vandalism to fence or green screen within one (1) day of notification by <br />the City. <br />Remove weeds or vegetation growing within License Area or around perimeter <br />within seven (7) days of notification by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.