Laserfiche WebLink
With In a reasonable tittle prior to file start of any an -silo ws•k, delivery or materials, equipment, or personnel, Conti octal- will submit to <br />Owner the 0ailowhngf <br />A- A complete SOLO rdrtnvings approved by Owner aid subsequently by the City in which the Building is loomed. <br />B- A fully executed Indenmity, Agreement (I'll Be Provided by Owner Upon Request), <br />C- Certificate of Insurailoo lit a form approved by Owner executed by Insurance companies acceptable, to aweer, <br />O- A Rrlly executed Notitcalfon-Rules for Contractors (To Be Provided by Owner Upon Request), <br />F,- A Job schedule of die walk to be aeeornptshed, detailed by [ratio. <br />F. A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />conmoncanenl of tholr wok. <br />(J- The name slid phone number (Including emergency phone numbers) ofpersonnel who are authorized to represent the Contractor. <br />3. - No Ievisions or changes ofsny kind may ba made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or charges must be submitted to ONvoor in the form of a change order, for owner's review and <br />approval prior to commencement of such changes, Revisions or chmngas altering the floor Pfeil, base building systems, or building <br />Operations must be Submitted, in writing, to tiro Owner for review and approval prior to commencement of work. <br />4. All ofContmatm''s work must be scheduled so that it in no wn), conflicts with, interferes Willi, or impedes the qulet and peaoeHll a oy, t <br />Of other tenants u• eceupants Of the P"Olent, or with the progress of Owner's work or operations, Any work hint Is in eon 01c1 will be <br />rescheduled by the Contacts, to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses <br />incurred by Contractor (or Tenant) in connection with such resolneduling• <br />S. Conhacts• mad suboort•aclors shall employ persons mad means for the orderly progress of the work without interruption on account of <br />strikes, wok stoppages or similar eauoos of delay, Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Conh•eomr (or Teranl) in connection with such delays. <br />6. Materials alit[ tool storage will be limited to file areas for which access bus been granted, <br />7. Clean-up and rubbish removal shall be provided by the Contactor at Contractor's expense. Cantractor must, on a dully basis, remove all <br />rubbish, surplus Sid waste material mauling floral the performance of his work. At the request of Owner, Contraotor shall relocate any <br />materials causing rat obstruction as directed by Owner, Contractor will not be allowed to place a dnmpster on site on a coutimrou4 bnshs <br />during construction, <br />Important note: The placement find location, of rubbish dumpsters and bins must be approved lit advance by Owlim <br />8, In general, Ownel. will Interfirco with Contractor to the axlont necessary for work to be completed within the gtddelbnes of project <br />specifications and for the enforcement orbuildiag ntlea and regulations, <br />9, Conauetar will make arrangements far unloading, trash removal and hoisting after normal working hops clue to the local city noise <br />ardomce. (No such activity will be allowed between the huun of 10:00 p.mn, to 7:00 win.) At no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied rim by Contracts• and approved by Owner. Contractor may be afforded access <br />to loading dock spaon and hoisting facilities for flmitod use at such time duping nonnal Working hours as Is prearranged with Owner, or at <br />other times, with the consent of Owner and upon Payment Ot'Owner's prevailing fee for allot -horns tine and access, <br />IO. Contractor will Ina afforded mlloading areas as praarrnnged with Onn ar, All materials unloaded at these areas will be moved to on give of <br />use Immediately and shah rat be stmod or used in away which advesely hnpnets Else of the Building, <br />11• Cmtlrttclor• (old Tencnt) will be responsible tin• the security or its own materials, equipment and work, slid that of his sublentractau•s. <br />Contractor will also be responsible Aar damage caused by Contractor or Its subcontactors to the Projeol, Building midAw tenant areas, <br />including, but not limited to the landing dock find indoor and outdoor public areas, Imight elevators, etc. Any such damages will be <br />pronnpdy rcpahcd to the Otnnces satfsthction at safe cuss OYConu•acton <br />12. Contractor will comply with all applicable codes, Imes and regniatisns pertaining to the work of Contraedor, including all safely and health <br />regulalons. The Contractor shall supply die Owuor with u Master USE of tdl Hazardous Matorials and their Material Safety Dale Sheela <br />(MSOS) upon delivery to [lie job site. A discussion will then ensue pertaining to 01e safe storage, handling find or these malarial$, as <br />wall us file Cuntactor's emergency Pr:paedness plan for handling the conoiumenl and dean -up of potential 1.1mirdous Malarial spills, <br />13. Contractor will not engage in oily labor Practice that may delay it. Otherwise ![',pact the work of Owner er tiny other contractor. <br />14, Nu base building systems will be intend off or disengaged by C•onu•noWr or any sutcnnn•uctor without prior' written approval find <br />supervision by a reprresenlative OfOwnel'Or its agent. Said systems include but are not limited to sprinklers, electrical circuits, Sir -handling <br />units, smoke heads and tvoter supply, Building e1ecu !cal power shut -downs are allowed, with Elie prior written consent orowne', on <br />Salnrclays between 10:00 17.111. and 3:00 ado. only, A request for approval shall be made to the Property Manager al )cast ten ( Ill) duys in <br />advance, <br />901 0•01dr Cealur Ur-06. V.saneu bra Leave -•f- ElArlI t 0 <br />