Laserfiche WebLink
15. Doors to all work areas, Including stairwells and nnechanlcnl and electrical closets, will remain closed nl all tine, Propping doors open is <br />expressly prohibited. <br />16, All Contractor and subcontractor personnel, materinls, louts and equipment ex+ to enter and exit the Budding through the service elevator <br />only. Owner may at any little inRlae a oheok infcheck out system, or A badge system, far all people and material in the Building and die <br />Contractor will agree to cooperate with any such system. <br />17, Before odeicg material or doing work which is dependent upon proper size or installation, the Contractor shot] field verify all dimensions <br />for accessibility with building conditions, and shall be responelbie Poe some. <br />18• Contractor sholl not permitted any identifying signage or advertising within the [imlact or Building. <br />19• During constuollon, Contractor shall maintain supervisory personnel Al the site at nil times. Such personnel shall be Wily authorized to <br />coordinate, respond for and aulhorizo Conractor's work as necessary so as to enable all work to proceed in a timaly and well-ordelnd <br />fashion. Should Contractor perform wort which would cause or require Owner to provide personnel to be present cr otherwise Perrann <br />any welt, Contraotorshall reimburse Owner for the expense of such personnel. <br />20, Contractor shall be responsible for the protection of its work And the area Adjacent to Iris work. <br />2L Contractor will ensure that all stairwells, nneollAilol rooms, electrical and telephone closets, etc, accessed by Can tractor or subcontractors <br />In conjunction with Contractor's work, will be cleaned and flee of debris nightly. <br />22. - Public areas adjacent to premises whore Contractor's work is being perfinmod shall rennin fi•ae or debris and materials at all limes. <br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold <br />harmless ilia Owner and the other Owner Parties irom and Against may and all claims, losses, or damages, threatened or incurred, arising <br />from the Actions or omissions ofCantracteror Its subcontractors. <br />24, if keys are required by contractors, they must be checked out from the Property Wingeme t Office. No key will be distributed If proper <br />identification Is not provided. <br />25, No cutting or patching afOwner's premises or installations, or those of any But occupant, shot be permitted without the prior written <br />consent of Owner. Request- for porrnission to do cutting shall include explicit detalls and description of work and shall not under any <br />circumstances diminish the stucnu'ail integrity, of the Building or die Integrity of any of components or systems. The work Is to be done <br />only.widn the explicit written permission of the Property Manager, and only on an "Off -Hours" basis, Such work is to be done only under <br />the direct supervision of a competent mombar of the Contractor stna,, Any such men is to be promptly repaired and returned to a fitly - <br />functioning, complete, and clean condition. - <br />26, All work is to be done to a mininiunn stondAd of quality as required by the Basr• Bidding Drawings Aad Specifications (to be made <br />available by Owner area request), It is the responsibility ortbe Contractor to be hilly knowledgeable of the Base Building Drawings and <br />Spedfioatlnns. <br />27, All Li to Softly 8ysloans fo•tho Building are to be maintained, and at of the TarlanPs walk is to be properly InterFnoad with and connected <br />to the Base Building systems as requhad by Laws, or by Building operation, All work I to be done in no all it way as to protect all Base <br />Building operations and warranties. Any required disconnection of life safety devices should he "foreseen" and Flee Property Management <br />Office must be notified At least 24 hours in advance. Casts far false fire Alarms due to contractors' or subcontractors' negligence will be <br />Wiled to and paid by the Contactor. All life, -safety aystetns testing must IV pe•ibrined on on "olle4holim" bn913 and coordinated whin the <br />Building Manager, <br />4, When worle is perfumed by Con4•oetor or subcontractor, charges will Apply for additional services performed by Owner which may <br />Include, but are not nacemarily limirod to the Following: <br />A - overtime or alter -hours clevRmr usage <br />B • nllllty uenge for construction activities beyond atendord power and water used in connection with general office uses <br />C- extra and continuous oleun-up ofolevalms and public spaces as required due to ecnstvctiai activity; Contractor to pruvitie the <br />usual protection of existing improvements, and oxereiso care and good son" <br />0. extended or after-hours use of the leading dock <br />29• In riddition to cleaning mquh•avnenls described above, Contractor shall, in preparation ibr substantial conipleliuh or occupancy of the <br />pivjectbyTenant, perform Foul cleaning ot'Conuactor's Work. <br />30. When Conutaclur takes aver an area Flom tile. Owner' before commencing work Contractor shall ascertain dial the man is in a ,,are and <br />smthaly condition, and ntninmin the Area as necossary (at its sale cost aid expense) lu it sale and snnitery condition and to a snindard <br />merlins all upplleablo Imes and mguallans. <br />31. Owner requires job Progress meetings. 'I lie Contractor will Attend ivilh a representative authorized to speak cud act on lie Contractor's <br />hahalf: AdJitimmlEy, the Contraclm•sbnll null fy the paver nFschulnlad job progress iitaetings, <br />41 ivebie Cmrfn• nr—LYc' q fSmrrn •4nn Uase -i• fAillrit D <br />