Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS'rREATMENT SYSTEMS <br />the scope of work shall include the following for the Planning Study: <br />A. MANAGEMENT ACTIVITIES <br />The Consultant shall .conduct project management activities to ensure adherence to <br />budget and schedule. The Consultant shall coordinate and attend meetings with City staff <br />pertaining to the project kiekoif, reviewing draft reports,.and as needed to prepare and <br />address projr:ct inquiries and Issues, In addition, the Consultant shall provide meeting <br />minutes,for each meeting as well is biweekly update; of.progross to the City, <br />B. WELL ASSESSMENT AND INITIAL TREATMENT DESIGN <br />The Consultant shall gather.infornlatiari on ilia City's groundwater conVbyance systerns, <br />impacted wells, reservoirs, imported Water connections, and conduct site visits per the <br />City's request to determine available area of land for the PFAS treatment system(s) as <br />well as determine how the treatment;system(s) wlil be Integrated into the My's existing <br />operations. The Consultant shall also review any existing and available informatiori nn <br />the City's .historical PFAS bench- and pilot -scale testing as well as historical Planning <br />Studies perforated and existing PFAS treatment facility layouts, and adhere to the <br />standards set therein, <br />In .the preliminary Planning Study, the Consultant shall provide a conceptual layout for <br />each requested location by the City based on exlsting ion exchange (IX) treatment <br />systems (AqueoUS Vets System rated for 150 PSI). For all IX wellhead treatment <br />designs; the Consultant shall Include cartridge filter pre-treatment, a sand separator, IX <br />lead -lag system capable of addressing the wells)'s gallon per minute capacity; an <br />emorgerwy generator, and .an additional sourid attenuated booster pump to combat the <br />head loss experienced through the new.treatment system, <br />C. PERMIT ASSESSMENT <br />The Consultant shall perform an initial permitting assessment to understand any <br />requirements, as well as develop a list of required permits (Include permit description, <br />Issuing regulatory agency, summary of permit requirements, and permit acquisitfon <br />timelines): <br />D, FEASIBILITY STUDY <br />The Planning Study shall possess a Feasihility Study in which the Consultant shall <br />Investigate hydraulic conditions of existing wells and. determine what modifications to <br />existing well purrips and transmission systems (booster pumps] will be necessary, if any; <br />for the installation of the proposed PFAS wellhead treatment facilities. <br />E. COST ESTIMATES <br />City of Santa Ana RFP 22-133 <br />on -Call Engineering Design Services for PFAS Treatment Systems <br />Page 15 <br />City Council 19 — 15 4/4/2023 <br />