Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEMS <br />The Consultant shall provide cost estimates for the treatment facility equipment, any <br />necessary land acquisitior to acrominodate d treatment system(s), permitting, plumbing <br />connections., transmission alignments and system integration. The Consultant shall also <br />include capital, maintenance and operation cost estimates for IX treatment s.ystem(s), <br />F. PRELIMINARY SCHEDULE <br />The Consultant :shall devdap a preliminary phasing schedule for construction in the <br />Planning Study.. The plan is intendod to provide the City a schedule .and projected annual <br />outlays for financial planning. In the preliminary schedule, the Consultant shall include the <br />anticipated duration of construction as well as any necessary utility extensions required. <br />G, FINAL. REPORT <br />The final report shalt include discussion of all items listed herein and shall be submitted <br />to the City for review and ccmi-nents. The Consultant shall provide a PDF digital copy of <br />the preliminary report and shall incorporate all commonts made by the City prior to <br />submlaing of the final report. <br />In addition to the aforementioned items, the final report shall also include one or more <br />sections summarizing major findings, any significant challenges or common themes <br />relevant to,the City's system, anti recommend anyfuture-notions by the City as next steps <br />towards PFAS treatment implementation, The report shall contain descriptions of <br />operation and maintenance such as IX resin frequency of charge out., equipment details, <br />samplelanalysis frequency, and what staff augmentation/certification is required, <br />2. DESIGN PHASES <br />Once the Planning Study has been completed, the Consultant shal[ provide design services <br />including preparation of design sheets, specifications and permitting. All submittals described <br />herein shall be provided in the form of a PDF digital copy (full-slze). The design phases shall <br />Include, but are not limited to the following Items: <br />A. DRAFT DESIGN REPORT (10% DESIGN SUBMITTAL) <br />The Contractor is required to create a Preliminary Design Report (PDR) based on the <br />Planning Study for each treatment site requested by the City. The PDR shall be considered <br />a 10% design level package for the project In which the IX wellhead treatment project goals <br />and design criteria are addressed with alternatives, analysis and potential risks. <br />B. FINAL. DESIGN REPORT (30% DESIGN SUBMITTAL) <br />After the City defines the major design elements of the project and refines the project's <br />scope, schedule and budgetaxpressed inthe preliminary design report, the Consultant shall <br />develop the Final Design Report, The Final Design Report shall be considered a 30% design <br />City of Santa Ana l 22-133 <br />On -Call Engineering Design Servloes for PFAS Treatment Systems <br />Page '16 <br />City Council 19 — 16 4/4/2023 <br />