My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO, 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR Pli TRE/1-ri SYSTEMS <br />b. Final architectural details — coordinated with structural system details <br />c. Special construction details completed <br />d, Complete coiling plan <br />e, Interior equipment <br />f. Boom finished schedule including: <br />i. Color selection <br />ii, Floor selection <br />iii, Wall finish <br />iv. Ceiling finish <br />g., Door schedule - including hardwares master key plan working with the City's <br />access control specialist <br />h, Window schedule Including hardware <br />I. Architectural accessories schedule <br />j. C.xi:erior finish and color schedule <br />III. Structural System <br />a. Completesetof structural drawings <br />b. Final structural details coordinated with architectural systern details (if <br />applicable)' <br />o, Permit set of stamped structural calculations <br />d. Final foundation and footing details <br />e. Final structural details including construction details <br />f. Final structural calculations <br />g. Performance requirements for shoring system identified <br />IV. Civil Site Plan System <br />a. Final estimate of fill and excavation quantities <br />b. Location of new utilities finalized <br />c. Utility connections finalized <br />d. Final design of water treatment facilities <br />e. Final channellzation plans <br />f. Final signing plans <br />g. Final landscaping plans (if applicable Including plant schedule) <br />h. 'Final irrigation system plans <br />i. Final erosion and sediment control plans <br />1, Final design of traffic mitigation <br />k. Permit set of stamped storm water management calculations <br />I. Surface Water Pollution Prevention Plans (SWPPS) when applicable <br />V. Mechanical System <br />a. Complete equipment schedule <br />b, Final piping plans <br />o. Final heating, ventilation and air conditioning (HVAC) plans <br />d. Final plumbing plans <br />e, Final fire protection plans and performance specifications <br />City of Santa Ana RFP 22-133 <br />On -Calf Engineering Design Services for nFAS Treatment Systems <br />Page is <br />City Council 19 — 18 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.