Laserfiche WebLink
ciTY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -GALL ENGINEIERING DESrGN SERVI+CES FOR PEAS TREATMENT SYSTEMS <br />C. PROJECT ADDENDA5 <br />The Gonsuttant is responsible for assisting with any addenda required durng the Wiling <br />process- The City shall work in conjunction with the Consultant in bidding out the project, <br />providing clarification and evaluating the potentiat Construction Contractors. <br />4, CONSTRUCTION PHASE <br />Upon request, the Consultant shall provide general services to support the construction efforts <br />and serve as an extension of City staff to assist in the overall delivery of the project, including <br />pre -construction tasks, reviewing construction submittals and ensuring that the warts is <br />completed in accordance with the contract documents, project closeout and commissioning <br />phase. <br />A. SUBMITTALfSIHOP D AWING REVIEW <br />The Consultant sha IF be responsible for review of comPreteriess and quantity of all required <br />shop drawings, product data:, Samples and other submitt;GIs. The Consultant shall trarwrR <br />the Submittals to City staffing for review and approval, and shall estabiish and implement <br />procedures for expediting the processing and approval or Submittals. <br />B. REQUEST FOR INFr]RMATION (RFI) RESPONSE <br />The Consultant shall assist with requests for information (RFIs) and shall update the City on <br />all RFIs issued in the duration of the project, The Consultant shall maintain, at the job site, <br />racards of contract documents including drawings, addenda, change orders, and other <br />modifications of plans and specifications rriarked to show all changes made during <br />constrractian_ The Consultant shall also maintain as -twit# records of underground utilities, <br />including locatians and depths of trenches. At the completion of the project, the Consultant <br />shall deliver to the City all contract documents including as -built records. <br />C. CHANGE ORDERS <br />The Consultant shall conduct comprehensive evaluation of change order requests. Provide <br />independent estimates, render recommendations and assist in claim resolution. The <br />Consultant shall regularly monitor and report on the status of the Project Construction <br />Budget on a monthly basis, indicating actual casts for Completed activities and work in <br />progress, and indicating estimates for Urtconepleted worts. Report should identity Variances <br />between actual and budgeted or estimated costs, and shall advise the City whenever it <br />appears that the Actual Construction Cost has exceeded, or will exceed. the Project <br />Construction B udget for the entire Project or any Project Component. <br />D. PROJECT CLOSEOUT <br />The Consultant shall evaluate the completion of the wont of the Construction Contractor and <br />CAY or 6anla Ana RFP 27-133 <br />on•calr <br />City Council <br />20 19 — 216 4/4/2023 <br />