My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22.133 <br />ON -CALL ENGINEERtNG RESIGN SERVICES FOR PFAS TREATMENT SYSTEMS <br />f, Final section views <br />g. Final plans of mechanical rooms <br />h. Final control diagrams Incruding control point list and final sequence of <br />operation <br />i. Final bulIdIng components-U- value calculations <br />f Final mechanical details <br />k. Final energy code calculations <br />VI. Electrical System <br />a. f.ightiflg and receptacleseircuited <br />b. Special electrical equipment Circuiled <br />c. Fi na I panel schedures — showing balanced .loads <br />d. Final arc flash analysis <br />e. Firl<al electrical fixture schedule <br />f. Complete one -lute diagrams which are direciy applicable to the panel <br />schedule <br />g. Final electrical details <br />h, Final electrical load calculations including emergency generatof system <br />bill. Instrumentation and Control System <br />a. Finai control schematics <br />b. Final security and access control plans <br />e. Final location of alarm devicas determir,ed <br />d. Final PLC/DC 3 wiring diagram <br />e. ACIDC power distribution wiring diagrams <br />I BID PHASE <br />Upon complelion and approval of the 100% design phase, the City shall request the Goonsuttant <br />to assist with the bidding phase_ <br />A, PROJECT MANAGEMENT <br />TFre Consultant shall ordinate and expedite the preparation, assembly and delivery of bid <br />documents for the City to administer via PlanetBids Portal- The Consultant snail take the <br />necessary procedures to administer any prequalifiration of potential Constriction <br />Contractors as directed by the City tc ensure that air Contracts are compe6tively brcf. <br />B. TEGHNi+CALSUPPORT <br />The Consultant shall pmvida technical' support to the City on questions regarding the <br />meaning and intent of the drawings and specifications. and shall assist in achieving the <br />resolution in clarifying any commenN potential Constwction Contractors may have during <br />the bidding phase. <br />City of Santa Ana RFR 22-1 33 <br />On —Call Enginewing Design Sarvica& for PEAS Traatroant SySiems <br />City Council page fg 19 — 215 4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.