Laserfiche WebLink
City of Santa Ana <br />Agreement No.: D2201000 <br />Project No.:C-06-8478-110 <br />Page 11 of 48 <br />A.2.2.4 [Reserved.] <br />A.2.2.5 DBE Reports for SRF Projects <br />The Recipient must report Disadvantaged Business Enterprise (DBE) utilization to the Division on the <br />DBE Utilization Report, State Water Board Form DBE UR334. The Recipient must submit such reports to <br />the Division annually within ten (10) calendar days following October 1 until such time as the "Notice of <br />Completion" is issued. The Recipient must comply with 40 CFR § 33.301 and require its contractors and <br />subcontractors on the Project to comply. <br />A.2.3 Signage. <br />a. The Recipient shall place a sign at least four feet tall by eight feet wide made of/< inch thick <br />exterior grade plywood or other approved material in a prominent location on the Project site and shall <br />maintain the sign in good condition for the duration of the construction period. The Recipient is <br />encouraged to use recycled or recovered materials when procuring signs and must comply with 2 CFR <br />200.323 if applicable. The sign must include the following disclosure statement and color logos (available <br />from the Division) and be consistent with the requirements at https://www.whitehouse.aovlwo- <br />contentluploads/2022/08/Buildino-a-Better-America-Brand-Guide.pdf, including the requirement for a <br />larger sign if located in a highway right-of-way ° <br />PRESIDENT JOE RIDEH <br />BUILDING A <br />��� BETTER AMERICA <br />Water Boards ° tadg�0'°' Clean Water <br />ErimuninentilPrnvKuan sl„o- mom P�wnin;: eunacav <br />b. "Funding for this Septic to Sewer Island Project has been provided in full or in part by the Clean <br />Water State Revolving Fund and President Biden's Bipartisan Infrastructure Law through an agreement <br />with the State Water Resources Control Board. California's Clean Water State Revolving Fund is <br />capitalized through a variety of funding sources, including grants from the United States Environmental <br />Protection Agency and state bond proceeds.' <br />C. The Project sign may include another agency's required promotional information so long as the <br />above logos and disclosure statement are equally prominent on the sign. The sign shall be prepared in a <br />professional manner. <br />d. The Recipient is encouraged to translate the sign (excluding logos) into the appropriate non- <br />English language(s). <br />A.2.4 Commencement of Operations. <br />Upon Completion of Construction of the Project, the Recipient must expeditiously initiate Project <br />operations. <br />A.3 DATES & DELIVERABLES <br />(a) Time is of the essence. <br />(b) The Recipient must expeditiously proceed with and complete construction of the Project <br />(c) The following dates are established as on the Cover Page of this Agreement: <br />Exhibit A <br />