My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUNBAR ARCHITECTURE DESIGN SERVICES
Clerk
>
Contracts / Agreements
>
D
>
DUNBAR ARCHITECTURE DESIGN SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:51:42 AM
Creation date
4/10/2023 1:25:48 PM
Metadata
Fields
Template:
Contracts
Company Name
DUNBAR ARCHITECTURE DESIGN SERVICES
Contract #
A-2023-044
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/21/2026
Insurance Exp Date
9/6/2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4: Construction Documents (90% and 100% plans) <br />Construction Documents (CDs) shall include finalizing approved deliverables from the Design Development <br />phase. This includes the provision of detailed engineering and construction drawings that will serve as the basis <br />for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100% plans, structural calculations, CASP report, final technical <br />specifications, finalized "Opinion of Probable Cost". 100% plans will go through a constructability, <br />review that could lead to comments and recommendations that should also be addressed and completed <br />as part of this deliverable. <br />Plans: Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Civil Engineering <br />o Parking areas <br />o Grading And On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans And Details <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />o Demolition Plans (interior and exterior) <br />o Construction Plans (interior and exterior) <br />o Reflected Ceiling Plans <br />o Exterior Elevations <br />o Interior Elevations <br />o Mechanical and Plumbing Plans/T-24 <br />o Electrical Plans, as applicable <br />o Architectural Details <br />o Structural Calculations <br />o Door/Window/Finish/Hardware Schedules <br />o ADA Path of Travel design and/or signage Plan <br />Structural Engineering <br />o Structural Design <br />o Structural Calculations <br />o Detailing <br />Mechanical Engineering & Plumbing <br />o Include new HVAC system <br />o Include new water service meters (1-domestic, 1-irrigation) <br />Electrical Engineering <br />o Electrical Site Plan (exterior lighting) <br />o Electrical Floor Plan (interior lighting) <br />o Light fixture schedule <br />o Security System <br />o Photomehics. <br />o Location of panels, switchgear, meters <br />o Details <br />o Notes, specifications <br />City of Santa Ana RFP 22-095 <br />Page Al -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.