My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUNBAR ARCHITECTURE DESIGN SERVICES
Clerk
>
Contracts / Agreements
>
D
>
DUNBAR ARCHITECTURE DESIGN SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:51:42 AM
Creation date
4/10/2023 1:25:48 PM
Metadata
Fields
Template:
Contracts
Company Name
DUNBAR ARCHITECTURE DESIGN SERVICES
Contract #
A-2023-044
Agency
Public Works
Council Approval Date
3/21/2023
Expiration Date
3/21/2026
Insurance Exp Date
9/6/2024
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
workspace and break room. A patio for activities is envisioned for the front (west) exterior <br />space. Secured enclosure off the rear (east) side of the building that opens onto the existing <br />alleyway is to provide access to police offices and staff. The city has noted that project will not <br />be considered an "Essential Services" building. <br />The exterior of the building, specifically the front and side elevations will be restored to retain <br />its character defining features. Using the original historic drawings and photos of the original <br />building, doors and windows will be recreated to return the building to its original exterior. <br />Interior and exterior lighting will be selected for appropriateness. The clay tile roof, stucco, <br />and decorative tiling will be cleaned, repaired, and reinstalled to match existing as needed. It <br />is anticipated that a new built-up roofing system will be required at flat and parapet roof areas. <br />Interior work will be designed to provide inviting and engaging spaces for users that is modern <br />but complementary to the historic building. Accessibility, safety, and inclusion will be the driving <br />factors for interior spaces and finishes. <br />Task 1: Pre -Design <br />Our first step after the initial kick off meeting will be to initiate a site survey, develop a base <br />level of working architectural drawings from the original building drawings, and determine if <br />additional information is needed. A meeting with city staff will be held to confirm program- <br />ming requirements and discuss initial concept design options. <br />DELIVERABLES <br />• A programming and project narrative, including engineering memos of expected scope <br />for structural, mechanical/ electrical/ plumbing, and civil engineering. <br />• Base level architectural plans for concept design discussions <br />• Work task plan and schedule <br />• Site survey <br />• Identification of additional material testing and investigative demolition, if necessary <br />Identification of applicable codes and standards and coordination of requirements with <br />appropriate agencies <br />
The URL can be used to link to this page
Your browser does not support the video tag.