Laserfiche WebLink
water agencies across the United States. WQTS' Los Angeles facility includes a fully equipped experimental laboratory for <br />conducting bench -scale studies on water treatment technologies including adsorption on activated carbon, ion exchange, <br />ozonation, coagulation, flocculation, sedimentation, formation of disinfection by-products, evaluation of adsorptive media, <br />and destruction of chemical contaminants. WQTS has partnered previously with KJ to provide bench -scale testing of GAC <br />and 1X resin to the Santa Clarita Valley Water Agency for their PEAS treatment systems. <br />C.2 KEY PERSONNEL AND ORGANIZATION CHART <br />The EEC Team's Orange County -based staff includes civil engineers, chemical engineers, chemists, regulatory specialists, <br />construction managers, hydrogeologists, and other professionals with the availability to support this contract. The staff <br />dedicated to this project are uniquely familiar with Santa Ana's PEAS issues and the ion exchange treatment design issues <br />that will be encountered. The EEC Team will have the ability to provide the appropriate dedicated staff with the proper skill <br />sets for assignments under this contract regardless of the schedule commitment. The brief summary below of the PFAS <br />related support currently being provided by EEC's team demonstrates our unique knowledge and expertise of the proposed <br />scope of work: <br />Will Shaffer, PE —Project Manager <br />Project Manager for all of EEC's as -needed PEAS services to Santa Ana. <br />• California Registered Professional Civil Engineer <br />• Reviewer of Well 40, 38, 27, 28, and 31 design reports and construction drawings <br />• Uniquely knowledgeable of Santa Ana's wells, distribution system, PEAS sampling progress, OCFCD permits, and <br />Santa Ana specific PEAS impact planning <br />• Leads monthly PEAS update meetings with Santa Ana staff <br />• Organized tours of Yorba Linda Water District central treatment plant and Fullerton Kimberly Well lA wellhead <br />treatment system <br />• Authored lessons learned document for key considerations during planning, design, construction, commissioning, and <br />startup <br />• Preparing for commissioning support of Well 40 treatment system <br />Will Shaffer was chosen to be the Project Manager and Single Point of Contact for this project due to his current role as the <br />Project Manager for EEC's Owner's Representative services for Santa Ana for all things related to PEAS. His strong design <br />skills, unique understanding of Santa Ana's needs and his strong working relationship with the same City staff that will be <br />involved in this project are critical for the overall efficiency and success of the project. <br />Jim Kolk — Principal -in -Charge <br />Principal -in -Charge for all of EEC's consulting services to Santa Ana in the last 10 years including: <br />• PFAS treatment implementation strategy development and support services <br />• Water system disinfection testing and analytical services <br />• Water conservation program assessment and response support <br />John Shaffer — Principal Chemist <br />Principal Chemist and regulatory specialist for all of EEC's as -needed PFAS services to Santa Ana. <br />• Expert on California and Federal PEAS current and future regulations <br />• PFAS waste disposal expertise <br />• Uniquely knowledgeable on PEAS treatment challenges related to PFAS chemistry <br />Dennis Kasper, PhD, PE — Technical Advisor <br />• 40+ years of water treatment design experience <br />• California Registered Professional Civil Engineer <br />• Design expert on wellhead treatment, ion exchange and granular activated carbon technologies <br />• Lead instructor for Santa Ana engineer and operator PEAS treatment training <br />• Reviewer of Well 40, 38, 27, 28, and 31 design reports and construction drawings <br />EEC Environmental 4 November 17, 2022 <br />