Laserfiche WebLink
DocuSlgn Envelope ID; F07EP34$-8A22-4923•BD05•AA30Ao439841 <br />DUDEK <br />Task 8, Public Hearing <br />This task would be the same as outlined far Task 5 under NDs/MNDs. <br />Tasks 9. Final EIR or EIR/EIS <br />Dudek will compile all comments received', and evaluate comments as to their relevance in addressing <br />project impacts, We will collaborate with City staff on appropriate strategies to address the comments <br />received. Dudek staff will draft responses to comments for City staff review, and make any <br />modifications upon recelving comments from staff. <br />Based on the commehts on the draft EIR or OR/>» IS, Dudek will prepare an administrative draft final <br />EIR or OWES, The final EiR or EiR/EIS will include redline/strikeout text to highlight changes in the <br />document, along with an errata chapter; and the comments and responses to comments. <br />Dudek will also prepare draft mitigation monitoring and report program, which will identify the impacts, <br />mitigation measures, timing of implementation, method of implementation, and responsible parties. <br />Following the revieW of the adminletrativefinal EIR or EII OS by City staff (and the federal lead <br />agency), Dudek will incorporate any revisions and address comments as requested by the City (and the <br />federal lead agency). We will submit a Soreencheck version of the Final, EIR or EIRMIS for final review, <br />addressing any final revisions or comments. Dudek will compile the Administrative Rpoord'for the City <br />as the project progresses so that we can turn over the files immediately upon project conclusion. <br />Dudek will also work with the City in the preparation of the fiindings of fact and. statement of overriding <br />considerations (if necessary), We will submit draft and final versions of these documents,. <br />Technical Studies <br />The; preparation of ISstNDs/MNDs,: FIRS, and E18s will require technical analysis to support <br />conclusions made in the documents, Our in-house environmental experts have completed,technical <br />studies and environmental reports that cover all environmental disciplines; A consistent theme across <br />all projects is ourfocus-on problem solving and using the right tools to deliver successful outcomes.. <br />Engineering Ruppert <br />Our engineers plan, entitle, and design land development and infrastructure projects. We understand <br />the importance of adhering to tight regulations, aggressive schedules, and narrow budgets, <br />Simultaneously, We navigate and comply with conditions of approval to design projects that are <br />practical, economically viable, and real(stio,given the regulatory environment, Out team includes i,EED- <br />accredited staff trained to create environmentally sensitive and law -impact designs that accomplish <br />desired results and produce.sustalrtabie Infrastructure, <br />stormwater [Drainage and Regulatory Compliance. Our engineers are experts in surface water and <br />stormwater drainage, including hydrology and hydraulic analysis. We have prepared numerous <br />stormwater pollution prevention plans, water quality management plans, and dust control plans for our <br />clients, and have experience with erosion and sediment control related to environmental compliance. in <br />addition, we prepare environmental constraints analysis; analyzing slopes, drainage, and the geology of <br />a project site. <br />On -Cali Environmental Services RFP# 21-105 25 <br />