Laserfiche WebLink
(9 <br />PROPOSAL FOR <br />On -Call Environmental services <br />RFP NO.: 21-105 <br />• First Street Stabilization Project CATEX, Santa Ana, CA <br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA <br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA <br />• Central Park Program EIR, Rancho Cucamonga, CA <br />• Santa Ana River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA <br />LICENSES, REGISTRATIONS, & <br />CERTIFICATES: <br />EDUCATIONAL BACKGROUND: <br />BS, Environmental Engineering, <br />POSITION WITH TETRA TECH: <br />Project Manager <br />Registered California PE <br />No.C70879 No. 74974 (2009) <br />California Polytechnic State <br />University, San Luis Obispo <br />PROJECT ROLE: <br />Preliminary Engineering <br />Qualified Stormwater Pollution <br />Prevention Plans (SWPPP) <br />Developer (QSD), Certificate <br />No. 74974 <br />EXPERIENCE: <br />Mr. Schreiner is a civil engineering project manager at Tetra Tech's office in Irvine, California. He manages <br />domestic projects on behalf of government clients, applying a successful 15-year history of project <br />management, hydrologic and hydraulic modeling, civil engineering design, condition assessments of a variety <br />of infrastructure, and cost estimating. He most recently served as project manager for numerous on -call <br />contracts with various public agencies in the Southern California area including Orange County Public Works, <br />L.A. Metro, City of L.A., John Wayne Airport, Riverside County Transportation Commission, and Los Angeles <br />County Department of Public Works. As a QSD, Mr. Schreiner has ample experience with providing SWPPP <br />for construction activities. <br />REPRESENTATIVE PROJECT EXPERIENCE: <br />• First Street Stabilization Project, Santa Ana, CA <br />• First Street Pedestrian Improvements, Santa Ana, CA <br />• Lincoln Avenue Pedestrian Pathway, Santa Ana, CA <br />• Complete Streets Projects (TOS-1), Los Angeles, CA <br />• Vermont Avenue Stormwater Capture and Green Street Project Phase 2, Los Angeles, CA <br />• Silver Lake Reservoir Stormwater Capture Project, Los Angeles, CA <br />• Caruthers Park Stormwater and Urban Runoff Capture Project, Bellflower, CA <br />UltraSystems <br />The UltraSystems project team has experienced senior staff (many with more than 30 years of technical <br />expertise). All key personnel have proven experience managing projects within Orange County. <br />UltraSystems project team key task leads are noted below. <br />Ms. Lindsay oversees the quality assurance program, and all matters relating to the contract, and contract <br />execution. Ms. Lindsay has over 35 years of experience, has successfully prepared over 400 <br />environmental documents for a broad spectrum of projects, and has managed over 20 large-scale, on- <br />call/as-needed contracts that have encompassed thousands of task orders relating to public agency <br />projects. Ms. Lindsay is able to communicate with clients, facilitate teams, manage personnel including <br />resource allocation, work collaboratively with agencies, run meetings for clients, provide strategic thinking, <br />and most importantly, get projects built for clients. <br />EDUCATION <br />M.S., Urban and Regional Planning, California State Polytechnic University, Pomona, CA <br />B.S., Geography, California State University, Long Beach, CA <br />RELEVANT EXPERIENCE <br />County of Orange, OC Loop Segments O, P, Q — IS/MND and CE <br />South Gate, Garfield Improvements — PES <br />City of Bell, Gage Avenue Bridge over the Los Angeles River— IS/MND <br />City of Santa Ana 6 TETRA TECH <br />