Laserfiche WebLink
Local Assivtaned N-6red&i, Mmual �. � i�.: ; Ea{i1191T51$J72i <br />s a a i`,m:r•::+ Cast Proposal <br />r' EXBBIT IO-H2 COST'PROPOSAL <br />SPECIFIC RATE OF COMPENSATION (USE FOR ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERMG AND INSPECTION CONTRACTS) <br />Consultant Kleinfelder, Inc. ❑K Prime Consulmnt Q Subconsultant 2nd Tier Subconsultant <br />Projett No. RFQ20-111 Contract No. TBD Participation Amount NTE 950,000.00 Data 127/2023 <br />EItNGE BENEFIT% + GENERAL&ADMNI5111ATIVE°/. COMBINED ICRY. <br />57.05% + 101.97% - 159.02% <br />Fee - 10.00% <br />2.84922 <br />BILLING INFORMATION CALCULATION INFORMATION <br />Name/Job Tid./Classificefion I Hourly Billing Rates Effcctive date oflsomty rate Actual.,Avg I %mS I HomlvRange- <br />ERA PREVAILING WAGE. <br />Hourly <br />Billing Rates <br />Effective date <br />ofhomly rate <br />Engineering 7edmidms (Field) <br />Straight <br />OT(I.5.) <br />OT(2z) <br />From <br />To <br />S 173.86 <br />S 245.80 <br />S 317.74 <br />10/12022 <br />9/302023 <br />Group I - Field Sods and Material Testers <br />S 179.08 <br />S 253.17 <br />S 327.27 <br />10/1/2023 <br />920/2024 <br />$ 184.45 <br />S 260.7] <br />S 337.09 <br />10/1/2024 <br />9/30/2025 <br />S 178.93 <br />S 253.40 <br />S 327.88 <br />10/12022 <br />9202023 <br />Gaup 2- Special Inspection /Batch Plant <br />S 184.30 <br />$ 261f0 <br />S 337.72 <br />10/1/2023 <br />9/302024 <br />S 199.83 <br />S 268.83 <br />$ 347.85 <br />10/12024 <br />9202025 <br />S 184.63 <br />5 261.95 <br />$ 339.28 <br />101W022 <br />9/302023 <br />Group 3- Nondestructive Testing <br />S 190.17 <br />S 269.81 <br />$ 349.46 <br />10/12023 <br />9/302024 <br />S 195.87 <br />S 277.90 <br />S 359.94 <br />10/12024 <br />1 9/302025 <br />Hourly <br />Bdhng Bates <br />Effective dote <br />of hourly mte <br />Engineering Teclivician(Field) - Special Shift - <br />Straight <br />OT(1.Sz) <br />OT(iz) <br />From <br />To <br />S 175.28 <br />S 247.93 <br />S 320.59 <br />10/12022 <br />9/302023 <br />Group I -Field Sods and Material Testers (Special Shift) <br />S 180.54 <br />S 255.37 <br />S 330.21 <br />10/12023 <br />9/302024 <br />S 185.95 <br />$ 263.03 <br />S 340.11 <br />10/12024 <br />9/3D2025 <br />S 180.35 <br />S 255.54 <br />S 330.73 <br />10/12022 <br />9/30/2023 <br />Group 2 (Special Shift) <br />$ 185.76 <br />$ 263.21 <br />S 340.65 <br />10/12023 <br />9/302024 <br />$ 191.33 <br />S 271.10 <br />S 350.87 <br />10/12024 <br />9/30/2025 <br />S 186.05 <br />S 264.09 <br />S 342.13 <br />10/12022 <br />9/3012023 <br />Group 3(Special Shift) <br />$ 191.63 <br />S 272.01 <br />S 352.39 <br />1 10/1/2023 <br />9/302024 <br />5 <br />NOTES: <br />'Subject to Prevailing Wage <br />-Biding rate= school hourly laze' (I+ICR)' (1 +Fee). <br />-Prevailing Wage DIR Determination: SC-23-63-2-2020-21) <br />-3%annual escalation <br />Page 4 of 5 <br />