My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID EVANS AND ASSOCIATES (3)
Clerk
>
Contracts / Agreements
>
D
>
DAVID EVANS AND ASSOCIATES (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 11:20:23 AM
Creation date
5/22/2023 4:40:12 PM
Metadata
Fields
Template:
Contracts
Company Name
DAVID EVANS AND ASSOCIATES
Contract #
A-2023-073
Agency
Public Works
Council Approval Date
5/2/2023
Expiration Date
8/16/2024
Insurance Exp Date
12/1/2024
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to provide <br />Landscape Architectural Design Services for loth and Flower Park— RFP No. 22-124 <br />CHALLENGES AND SOLUTIONS <br />The following diagram depicts our understanding of the challenges associated with this project site. We have <br />developed solutions that DEA will implement to assist the City in delivering a park that includes features <br />requested by the community. <br />r <br />LEGEND Challenge <br />. "`i) Adjacent to high volume street poses challenge for noise, safety and <br />Existing Tree exposure to pollutants. <br />Solution <br />Bus Stop Park design will look to create a park border to help reduce these impacts <br />while active play features will be located away from Flower. <br />Pedestrian Access <br />Challenge <br />1 Park perimeter issues include the Garnsey Street homes and the street itself, <br />Tl Highly Visible Corner street parking, determination of right-of-way, curb and sidewalk conditions. <br />Solution <br />DEA will work closely with the City to determine street parking requirements <br />and the impact on park users as well as improving pedestrian site access. <br />NEIGHBORHOOD <br />C Challenge <br />0.5 miles to Santa Ana City Hall <br />�✓ South edge of site is directly adjacent to neighboring parking lot. <br />Solution <br />0.3 miles to Santa Ana Public Library <br />Park design will screen the parking lot, DEA will work with the City to <br />determine if access is needed. <br />0.2 miles to Santa Ana Stadium <br />Challenge <br />0.3 miles to Storybook Preschool <br />Existing site soil conditions could prevent proper infiltration or bio-filtration. <br />Solution <br />These conditions can be solved using proprietary water quality structures <br />similar to those found at other City parks. <br />16 1 February 28, 2023 1 David Evans and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.