My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC. (3)
Clerk
>
Contracts / Agreements
>
E
>
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 8:35:50 AM
Creation date
5/30/2023 5:53:35 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.
Contract #
A-2020-241-15-02
Agency
Planning & Building
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />day <br />- <br /> <br />Santa Ana <br /> <br />at remains, <br /> <br />measures, and <br />City of <br />following the 30 <br />NOP <br />IS/ <br /> <br />General Plan policies, programs <br />The environmental setting section <br /> <br /> <br />, <br />ity of the project site and identifies <br /> <br />, along with the project objectives from the <br />The impacts and mitigation measures part of <br /> <br /> <br /> <br />: <br />specifically, how the mitigation measure will be <br /> <br />– <br /> <br />purpose of the proposed project. The statement of <br />sections: <br />ft EIR <br /> <br />- <br /> <br />6 <br />ironmental issue areas. In each analysis section, EPD will <br />City requirements (e.g. <br />for review and comments.sub <br /> <br /> <br />the end of Task 1; however, minor changes may be made <br /> <br /> <br />. A statement of project objectives is also included in the Project <br />Review <br /> <br />and Applicant <br /> <br /> <br />This section will consist of a concise summary of the information presented <br />The project will be identified <br /> <br />Peer <br /> <br />. <br /> <br /> <br />Santa Ana <br />EIR <br />This section is intended as a convenience to the reader who is not familiar with <br /> <br />objectives and implementation <br />. <br />ectives identify the underlying <br /> <br /> <br />raft <br />D <br /> <br />identifying the primary documents used in the preparation of the section and any other <br /> <br />controversy and issues to be resolved. <br />and Technical Study <br />Draft EIR to the City <br /> <br />Environmental Setting, Impacts, and Mitigation Measures. <br />Executive Summary: <br /> <br />standards and policies. The standards/criteria of significant will be developed based on CEQA <br /> <br />. <br />a brief project description;a tabular summary of findings regarding project and cumulative impacts, mitigation any unavoidable significant impacts; a summary of discretionary approvals <br /> required for the project; a brief description of the alternatives considered, noting which one was considered the environmentally superior alternative; and areas of Introductionpertinent <br /> information. <br />Administrative <br />istrative <br /> <br /> <br />3 <br />ned, a discussion of the environmental review process for this project will be presented, and <br />oject objectives helps a lead agency develop a reasonable range of alternatives to evaluate in an EIR <br />Task Subtask 3.1 Administrative Draft EIRThe Administrative Draft EIR will be prepared in accordance with the State CEQA Guidelines and City of Santa AnaGuidelines and tailored or refined <br /> as relevant toor guidelines, and adopted ordinances). The impact analysis will specify the standards of significant thresholds for each topic. EPD will review all comment letters received <br /> on the review period to ensure that all relevant concerns are addressed in the Draft EIR. EPD will provide the Admin The following paragraphs discuss the sections of a Dra Chapter 1. <br /> in the main body of the EIR:Chapter 2. Introduction CEQA, EIRs, or the environmental review process. The purpose and standards of adequacy for an EIR will be deficharacteristics of <br /> an EIR and the reasons for preparing an EIR for this project will be described.Chapter 3. Project Description standpoint of the City of Description. Project objprand aids in the preparation <br /> of Findings of Fact and a Statement of Overriding Considerations, if necessary. The Project Description should be complete by during EIR preparation.Chapter 4 includes an overview of <br /> the general setting of the environment in the vicinthe related projects used in the cumulative impacts analysis. Chapter 5. Environmental Impacts and Mitigation Measures. this chapter <br /> includes an analysis of the topical envidentify applicable Project Design Features; Standard Conditions of Development; and Existing Plans, Programs, and Policies that reduce environmental <br /> impacts. For each significant adverse impact thCEQA requires that an EIR discuss feasible mitigation measures to avoid or substantially reduce the project’s significant adverse environmental <br /> effect. Drafting effective mitigation measures involves clearly explaining the mitigation measure’s put into action, who is responsible for its implementation, where it will occur, <br /> and when it will occur. Each environmental issue will include the following Proposal for CEQA Related Bristol Specific Plan <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.