My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC. (3)
Clerk
>
Contracts / Agreements
>
E
>
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2023 8:35:50 AM
Creation date
5/30/2023 5:53:35 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.
Contract #
A-2020-241-15-02
Agency
Planning & Building
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />hat <br />(or <br /> <br />NOP <br /> <br />eeting, <br />m <br />Santa Ana <br />the <br /> <br /> <br />he Notice <br />heets <br />– <br />CEQA the t <br />s <br /> <br /> <br />in <br />- <br />per, and comment <br />City of <br />with the County <br /> <br />coping <br />s <br />deration. By fully <br />, sign <br /> <br />EPD will address City <br />will be responsible for <br />public <br />general, and local and <br /> <br />to the State Clearinghouse via <br />NOP comment period. EPD will <br />public review IS based on the <br /> <br />(NOP) for the EIR <br />IS/ <br /> <br />(or virtual alternative) <br /> <br /> <br />, as appropriate. <br /> <br />day <br /> <br />- <br />ts received during the Scoping Meeting. <br />person assumed) <br />- <br />(in <br /> <br />in sheets <br /> <br />Preparation- <br /> <br />nclude, in addition to the Project Description <br />ument as an appendix. For those environmental <br /> <br /> <br />person <br />all commen <br />NOP <br /> <br />- <br />EPD will prepare a <br />Additionally, EPD will present the project and CEQA <br />It is anticipated that the City <br /> <br />ding the public scoping meeting. <br />during the 30 <br /> <br />of <br />. <br /> 5 <br />IS/ <br />ISNOP <br />EPD will post the IS/NOP <br />or in <br />mailing notices to distribution list, posting <br />Notice of <br /> <br />, <br />(or virtual alternative) <br /> <br />idelines may be used. <br />the <br />and held <br />NOP on the City’s website. <br /> <br /> <br />a virtual <br />d <br />and and agencies (and Administrate Record copies of NOP <br /> <br /> IS/ <br />will assist the City with scheduling and setting up the meeting at the <br />, <br />he City (i.e. <br />t Review <br />significant environmental issues from further consi <br />- <br />EPD <br /> <br />Peer <br />It is expected that <br /> <br />setting up <br /> (or virtual alternative) <br />comments <br /> <br /> <br />nd <br />County Clerk <br />, and comment cards <br />The checklist used may be provided by City staff, or, alternatively, the standard <br />NOP. EPD will prepare the State Clearinghouse submittal forms, including <br />EPD will prepare a summary <br />. <br />ronmental effects in the IS, the EIR will focus on those impacts that could be significant <br /> IS/ <br />The NOP will include details regar <br /> <br />one Scoping Meeting and prepare Power Point presentation, agenda <br /> <br />distribution to State Clearinghouse <br />and Technical Study <br /> <br />NOP <br />h the IS. The IS will include a completed environmental checklist form, included written explanations <br />City and Applicant prepare a Power Point presentation, agenda, sign <br /> <br />Attend one meeting with City Planner on the Electronic copies of draft and revised/final Electronic copies of draft and revised/final IS/NOP distribution to delivery/receipt confirmations, <br /> proof of posting, etc.)Present atvirtual alternative)Summary of comments received during the Scoping Meeting <br />Deliverables <br /> <br />checklist questions. <br /> <br />2 <br />identified location <br />- <br />ombined <br />for City and Applicant review and comment. The IS will idescribed earlier, a location map showing the project site, site photos, project plans, zoning and land use maps, and other explanatory <br /> exhibits, as well as a discussion of the probable environmental effects thave been identified. EPD’s experience with specific plan projects, the environmental review process in regional <br /> environmental conditions, will bring efficiency that will ultimately result in a smoother EIR process, starting witto all checklist found in Appendix G of the CEQA Gu The EPD team will <br /> use existing information to the greatest extent possible. EPD proposes to use an expanded IS to eliminate or “scope out” nonaddressing some enviand unavoidable, or for which substantial <br /> analysis and/or mitigation measures are required. The resulting IS would be made a part of the EIR by incorporating the docimpact areas where significant impacts are expected, the discussion <br /> in the IS will be limited; detailed environmental analysis will be reserved for the EIR phase. Subtask 2.2 Notice of PreparationFollowing City and Applicant review of the draft IS, <br /> cCity’s requirements. and applicant comments (as reviewed and deemed appropriate by the City) on the NOP and will provide the City with the final of Completion form and the State Clearinghouse <br /> Summary Form. EPD will prepare and distribute on behalf of and in coordination with Clerk and State Clearinghouse).the state’s CEQAsubmit portal on behalf of the City. noticing in a <br /> newspaper and posting the Subtask 2.3 Scoping MeetingA public scoping meeting will be scheduleassist the City in scheduling aas well ascards for the Scoping Meetinginformation at the <br /> scoping meeting. City Task Proposal for CEQA Related Bristol Specific Plan <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.