Laserfiche WebLink
. �. <br />CITY OF SANtffl ANA <br />RFP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />Sample Task Order B - Concrete Paving <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />I <br />Unclassified Excavation <br />550 <br />CY <br />$298.00 <br />$163,900.00 <br />2 <br />PCC Sidewalk (T=4") <br />2,500 <br />SF <br />$23.00 <br />$57�500 p0 <br />3 <br />PCC Curb Ramp —_—---- — <br />3 000 <br />SF <br />$62.00 <br />$186,000,00 <br />4 <br />PCC Curb and Gutter (T A-2-8) <br />too <br />LF <br />$185.00 <br />$18 500.00 <br />5 <br />Furnish and Install #6 Pullbox <br />4 <br />EA <br />$2,200.00 <br />$8 $00.00 <br />6 <br />Ad'ust Manbole to Finished Grade <br />$1 900.00 <br />$9,500.00 <br />_Catch <br />Basin 1Tv ae "B," W=10') <br />$13,000.00 <br />$13,000.00 <br />8 <br />Remove and Re lace Ed Concrete Pine <br />T75LF <br />$460.00 <br />$34,500.00 <br />9 <br />Guard Rail Replacement Caltrans RSP A77N4 <br />$150.00 <br />$750000 <br />10 <br />Guard Rail ke ilacement Termination Caltrans) <br />$9,000.00 <br />$9000.00 <br />11 <br />Remove and Replace Chain Link R/W Fence <br />$160.00 <br />$8 000.00 <br />12 <br />Concrete Barrier Type 836 Caltrans <br />50 <br />LF <br />$630.00 <br />131,500.00 <br />13 <br />Traffic Control Work <br />I <br />LS <br />$48,000.00 <br />$48 000.00 <br />SURETY BOND <br />For each Task Order Issued by Public Works Agency, the City may or may not require the Contractor to provide <br />cash deposit or surety "Payment" and "Performance" bond. Depending upon the size, nature and risk of the <br />work, the City may use the amounts specified by the "Greenbook," surface drainage or street improvement plan <br />measurements, or the approved itemized cost for each On -call or Emergency Task Order to calculate bond <br />amounts, if any. Task Order work shall be per the City's Standard Plans, As -Built Plans, or other direction from <br />the Public Works Agency. If required for a Task Order, the cash deposit or the surety bonds shall guarantee the <br />construction of all necessary improvements for the Task Order, however. Bid Bonds were not reouired at the <br />time of the submittal of RFP Proposal. For Task Orders, the City also reserves the right to retain 100/o of <br />progress pay amounts for the one-year warranty work. If so, the cash deposit shall be released approximately 135 <br />days after all related permits and/or other approvals required are signed off by the City's Construction Inspector, <br />and the passage of any lien periods, In the event the work is not completed within one year of the date that a street <br />work permit or Task Order is signed, applicant agrees that the City may apply the cash deposit to the cost of <br />completing the work and such work may be completed at the sole convenience of the City of Santa Ana. <br />CONTRACTOR RE, SPONSIBLITIES <br />Contractor must be able to respond to City's request for emergency repair work on a timely and urgent manner. <br />The contractor shall be available on an on -call basis, 24/7, and ready to respond in the event of an <br />emergency. Service calls shall be responded within one hour. Contractor's repair crews must be able to <br />arrive at job site within 8 hours of approval from City to commence work. Regular business hours are <br />considered from 7:00 am to 5:00 pm (Monday through Friday). Anytime outside of business hours of operation <br />may be considered after hours/weekends. <br />The Contractor shall, prior to award of contract and without additional expense to the City, possess all licenses <br />and permits (unless waived by the City) required for the performance of the work required by this contract, <br />including but not limited to a California Class (A, C-8 or C34) Contractor's license and a City of Santa Ana <br />Page 2 of 8 <br />