Laserfiche WebLink
Time Material Rates for Excel Paving and Subcontractors <br />R , P NO.22-096: ON -CALL EMERGENCY ASPHALT AND PCC <br />Excel Paving T&M Rates <br />Description <br />Cost / HR <br />Foreman <br />$ <br />114.00 <br />O aerator <br />$ <br />112.00 <br />Laborer <br />$ <br />86.00 <br />Teamster <br />$ <br />87.00 <br />Car enter <br />$ <br />92.00 <br />Cement Mason <br />$ <br />92.00 <br />ski <br />$ <br />68.00 <br />roller <br />$ <br />56.00 <br />aving machine <br />$ <br />195.00 <br />water truck <br />$ <br />45.00 <br />street sweeper <br />$ <br />200.00 <br />backhoe <br />$ <br />98.00 <br />saw <br />$ <br />85.00 <br />blade or loader <br />$ <br />92.00 <br />truck -Super 10 <br />$ <br />150.00 <br />move track <br />$ <br />60.00 <br />Any Labor or Equipment not listed above will be billed per Company's (Excel's and subs') standard T&M rates. <br />The Labor rates are only for regular business hours from 7:00 am to 5:00 pm Monday through Friday. <br />Anytime outside of regular business hours of operation will be considered after hours/weekends. <br />After horns work includes overtime, double-time, and/or holiday time, and will be billed per actual premium time rates. <br />The Labor rates are good through June 30, 2024. Excel will submit revised Labor rates on July 1, 2025. <br />All material costs will be added to the cost proposal per actual invoices. <br />Excel Paving will add the following mark-ups to the costs: <br />Category <br />Mark-up % <br />Labor <br />20% <br />B 'pment <br />15% <br />.__ <br />Material -except Concrete <br />.. <br />10% <br />Material -Concrete <br />15% <br />Sub first $5,000 <br />10% <br />Sub over $5 001) <br />Bond <br />5% <br />1% <br />