Laserfiche WebLink
CITY OF SANTA ANA <br />RPP NO.: 22-096 <br />ON CALL CMCRGCNCY ASPHALT & PCC <br />'COPE OF LVORIC <br />Introduction and I3aclt round, <br />The City of Santa Ana (City) desires to enter into an agreement with a qualified construction. eompany'for <br />the repair ofroadway asphalt concrete and concrete, and/or other infrastructure within the public right of that <br />may experience failures within the term of the agreement on an on -call and emergency work tot, general <br />improvements, on anus needed, Task Otderbasis, <br />DESCR&TION OF WORIK- <br />The scope of work will vary per Task Order within the public right-ol=way. It may include, but not be limited <br />to, the procurement and/or removal of materials, excavation, installation, backfi11, compaction, grading, <br />sidewalk and paving, curb and gutter, fencing, guardrali, barrier, and pavement markings,striping, signs, sign <br />posts and miscellaneous other street ktimiture, and repairlrtg various itcaus within the public right -or -way, tratlic <br />control, mobilisation, compliance with this agreement and all other work necessary to complete on•call <br />emctgency Task Orders specified per incident. <br />The work completed shall be in compliance with the City's Standard Plans, Caltrans Standard Plans and the <br />"Orcenbook" and Caltrans' Standard Specifications and as specified In this Agreement, 'Work shall also be in <br />compliance with the City's Standard Plan No. 1160,, "Street Work and Utility Permit General Provisions." <br />QUANTITIES FOR FEE SCHE'DUI,I 'UNDER SEPARATE COVEI2j. <br />For the Purposes of providing a Pee Schedule based on the below Sainple Task Orders, the fallowing work items <br />and quantities are provided. The Fee Schedule in Attachment 51 <br />Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor stall' <br />and labor personnel. Additionally; for each discipline that a company seeks to be considered, the below table(s) <br />shall be completed. For example, if General Contractor is submitting for Asphalt Concrete and Concrete Work, <br />Sample Task Orders A and B world both be required to be completed as part of the Fee Schedule, Each table <br />shall include the tilling in of tile last two eolumrns for the relevant sainple task ordem for whichever oatogory(ies) <br />are being submitted for consideration„ However, actual work will be paid l'bras described in Section I.A. "Nature <br />of Work." Sample Task Orders for Asphalt Concretc and Concrete roadway and sidewalk and related work are, <br />respectively; <br />Sample Task Order -Asphalt Concrete <br />Description <br />Qty <br />[runt <br />Unit Prtee <br />Total <br />d k xcavati550 <br />CY <br />$175,00 <br />nt <br />NFurnisli <br />130 <br />TN <br />$400,00 <br />Instll !16 Pa1111- <br />4 <br />fiA1600M <br />hole to Pinislred Gratl <br />1700.00 <br />and Gutteri a A•2.8 <br />100 <br />LP <br />$105.00 <br />� <br />Si nin and 5tri"sin <br />1 <br />7 <br />Traffic Ceutrol work <br />1 <br />LSNIA <br />Page 1 of 8 <br />