Laserfiche WebLink
CITY OF SANTA ANA <br />RpP NO.: 22-096 <br />ON CALL EMERGENCY ASPHALT & PCC <br />Sa►nple Task Order B » Concrete Paving <br />Mont <br />Description <br />Qty <br />Unit <br />Unit price <br />Total <br />I <br />Unclassified Rxcavation <br />550 <br />Cy <br />$175.00 <br />2 <br />FCC Sidowalk (awl) <br />2,500 <br />SF <br />$14.00 <br />3 <br />PCC Curb Rani <br />3' 00o <br />SF <br />$40.00 <br />11 <br />PCC Curb and Gnttor T o A 2-S <br />100 <br />LF <br />$145.00 <br />5 <br />Furnish and Install #6 Pulibox <br />4 <br />rA <br />$600.00 <br />6 <br />Atl'ust.Manboleto Finished Grade <br />S <br />EA <br />21700A0 <br />7 <br />Catoli Basin 7' e"n," W=:10, <br />t <br />FA <br />$13,000.00 <br />8 <br />Reniovo and Re ilacc 30" Reinforced Coner'ete Pile <br />75 <br />t;P <br />$300.00 <br />9 <br />Guard Rail Rc lammont (Cal(rans RSP A77N4) <br />5o <br />IX <br />NIA <br />10 <br />Guard Rail Re laoen)ont Termination Cnitrans <br />I <br />EA. <br />NIA <br />I t <br />Romovo and Re ilaco Chain. Link R/W Feriae <br />50 <br />1 F <br />N/A <br />12 <br />Concrete Barrier e 836 Caltrans <br />50 <br />GI <br />N/A <br />l3 <br />TtaffieControl work <br />I <br />LS I <br />NIA <br />SURETY HONE) <br />For each Task Order issued by Public Works Agency, the City may or nWx not require the Contractor to provide <br />cash deposit or surety "Payment" and "Performance" bond. Depending upon the size, nature and risk of the <br />work, the City may use the amorous specified by the "Greenbook," surface drainage or street improvement plan <br />measurements, or the approved itemized cost for each Oneall or Emergency Task Order to calculate bond <br />amounts, if any, Task Order work shall be per the City's Standard Plans, As -Built Plans, or other direction Prom <br />the Public Works Agency. If required far a Task Order, the cash deposit or the surety bonds shall guarantee the <br />construction of all necessary improvements for the Task Order, howeverii ends were pat required ut the <br />time of the subr>Iittal of RP'P Proposal, For 'Task Orders, the City also reserves the right to retain 10% of <br />Progress pay amounts for the one -your warranty work, If so, the cash deposit shall be released approximately 135 <br />days alter all related permits and/or other approvals required are signed Why the City's Construction Inspector, <br />and the passage of any lien periods. In the event the work is not completed within one year of the date that a street <br />work permit or Task Order is signed, applicant agrees that the City may apply the cash deposit to the cost of <br />cotnplethig the work and such work may be completed at the sole convenience of the City of Santa Ana, <br />CONTRACTOR RESPONSII#LITII;S <br />Contractor must be able to respond to City's request for emergency repair work on a timely and urgent manner. <br />The contractor shall be available oil au on -call basis, 24/7, and ready to respond in the event of an <br />emergency. ,Service calls shall be responded within one hear. Contractor's repair crews must be able to <br />arrive at job site within 8 hours of approval from City to Continence work. Regular business hours are <br />considerod f►am 7:00 am to 5;00 pin (Monday through Friday), Anytime outside of businesshours of operation <br />may be considered after hours/weekends, <br />'flit Contractor shall, prior to award of contract and without additional expense to the City, possess all licenses <br />and permits (unless waived by the City) required for the perfonnarlce of the work required by this contract, <br />including but not limited to a Caliltsrnia Class (A, Cµ8 or C34) Contractor's license and a City of Santa Ana <br />Page 2 of 8 <br />