My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRIFFIN STRUCTURES
Clerk
>
Contracts / Agreements
>
G
>
GRIFFIN STRUCTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 4:06:06 PM
Creation date
6/8/2023 4:41:10 PM
Metadata
Fields
Template:
Contracts
Company Name
GRIFFIN STRUCTURES
Contract #
A-2023-102
Agency
Library
Council Approval Date
6/6/2023
Expiration Date
12/31/2025
Insurance Exp Date
12/31/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Consult with the City when the contractor requests interpretations of the meaning and intent of the <br />drawings and specifications, and assist in achieving the resolution of problems, which may arise. <br />15. Record the progress of the project. Submit written daily and progress reports to the City. Keep daily <br />logs containing a record of weather, contractor's work on the site, number of workers and <br />equipment, work accomplished, problems encountered, and other relevant data. Make the log <br />available to the City. Prepare and send Weekly Statement of Working Days to the contractor. <br />Monitor contractor's compliance with labor code requirements. <br />16. Maintain, at the job site, records of contract documents including drawings, addenda, change <br />orders, and other modifications of plans and specifications marked to show all changes made during <br />construction. Maintain as -built records of underground utilities, including locations and depths of <br />trenches. At the completion of the project, deliver to the City all contract documents including as - <br />built records. <br />17. Evaluate the completion of the work of the contractor and make recommendations to the City when <br />work: is ready for final inspection. Assist the City in conducting final inspections. <br />18. Facilitate and coordinate inspection by representatives of other agencies. <br />19. Schedule and coordinate special inspection and material testing with the County of Orange or other <br />consultants. <br />20. Assist City with project budget tracking by funding source to ensure progress payment applications <br />are applied appropriately to correct funding sources. <br />21. Assist City with submission of narrative and financial reports on the progress and activities of the <br />project to grant agencies. <br />22. Provide a Site Utilization Plan. <br />23. Consultant team shall provide one (1) Class "A" Field Office for shared Agency Personnel use <br />for the duration of the project per Greenbook 2018. The consultant team is responsible for <br />securing the trailer. The proposed location of the trailer shall be shown on the site utilization plan <br />and must be approved by the City. <br />24. Shall monitor and enforce prevailing wage forms and requirements for conformance to the <br />prevailing wage rates on a weekly basis. Shall verify that all Trade personnel listed in the daily log <br />are also listed in the certified payroll and shall conduct weekly employee interviews, one for each <br />trade, and submit verification with the monthly progress payments. <br />25. Shall coordinate and assist the City's Community Work Force Agreement (CWA) Consultant to <br />monitor and enforce the CWA forms and requirements to ensure compliance. Verification should <br />be provided with the monthly progress payments. <br />26. The CM shall be responsible for all project closeout items, such as: As -Built plans and related <br />documentation, punch list completion, commissioning, warranty requests during the one-year <br />period. Shall schedule and oversee the warranty repair. Should include site visits as requested by <br />the City to look at defects or imperfection to determine if it is a warranty issue. <br />City of Santa Ana RFP 22-173A <br />Page Al-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.