My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRIFFIN STRUCTURES
Clerk
>
Contracts / Agreements
>
G
>
GRIFFIN STRUCTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 4:06:06 PM
Creation date
6/8/2023 4:41:10 PM
Metadata
Fields
Template:
Contracts
Company Name
GRIFFIN STRUCTURES
Contract #
A-2023-102
Agency
Library
Council Approval Date
6/6/2023
Expiration Date
12/31/2025
Insurance Exp Date
12/31/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The city reserves the right to add or reduce some of the above tasks and duties as it sees fit. The consultant, <br />serving as staff extension, shall remain sufficiently flexible to meet the needs of the City and of the project. <br />Plan Check & Permits: <br />Construction drawings shall be in accordance with the 2022California Building Code and will require <br />review/approval by the City Planning and Building Agency. Additionally, this would be subject to review by <br />the Historic Resources Commission. <br />Newhope Library, Delhi Center Library Branch, Outdoor Library at Jerome Park <br />TASK 1: Construction Management and Inspection Services <br />1. A CM who is a registered engineer or certified construction manager in the State of California is <br />highly desirable. The CM shall possess a minimum of (5) years' experience in construction <br />management. The Inspector and the Contracts Administrator should have relevant experience in <br />construction management and certifications that affirm the experience. <br />2. Prior to the start of the project, the CM shall be responsible for conducting a bid analysis to <br />determine who the lowest responsible bidder for the project will be. Shall obtain certificates of <br />insurance, performance bond and "New Vendor Packet" requirements have been satisfied. This <br />includes verifying that all sub -contractors have a valid City Business License. Once determined, a <br />staff report will need to be generated to recommend the award of a Construction Contract. <br />3. The CM team shall be responsible for review of completeness and quantity of all required shop <br />drawings, product data, samples, requests for information (RFI), and other submittals <br />("Submittals") using Procore software. Shall coordinate with design consultant to review before <br />transmitting their assessment of each Submittal to City staffing for final approval, and shall <br />establish and implement procedures for expediting the processing and approval of Submittals. <br />4. Lead pre -construction meeting and schedule and conduct weekly construction and progress <br />meetings to discuss such matters as procedures, progress, problems and scheduling. Will prepare <br />and promptly distribute minutes. <br />5. Attend and co -lead one (1) Construction Update meetings with the community. Primary purpose <br />of this meeting is to provide pertinent updates to the community and answer any questions relating <br />to the construction project. <br />6. Shall be responsible for ensuring that all building permits, special permits, if required are obtained, <br />and that all applicable fees have been paid, and shall obtain approvals from authorities having <br />jurisdiction over the Project. <br />7. Shall review construction schedule, including activity sequences and duration, schedule of <br />submittals and schedule of delivery for products with long lead-time. Update the project schedule <br />as required showing current conditions and revisions required by actual progress. <br />8. Shall conduct comprehensive evaluation of change order requests, provide independent estimates, <br />render recommendations and assist in claim resolution. Shall regularly monitor and report on the <br />status of the Project Construction Budget on a monthly basis, indicating actual costs for completed <br />City of Santa Ana RFP 22-173A <br />Page Al-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.