Laserfiche WebLink
Proposal to provide <br />On -Call Landscape Architectural Services — RFP No. 22-097 <br />Task 15 - Construction Details <br />DEA will prepare construction details for the proposed park elements such as concrete paving / finish, asphalt <br />paving, decomposed granite paving, play surfacing, trash enclosure, shade shelter (structural calcs by <br />manufacturer), fencing, concrete curbs, garden appurtenances, playground equipment layout, historical kiosks, <br />and signage. <br />Task 16 — Irrigation Plans <br />The irrigation plans will provide the necessary information for a complete and fully automatic irrigation system <br />for the proposed park site. The plans will indicate the point of connection(s) based upon agency requirements, <br />backflow prevention and pressure regulation, and equipment size and type in the irrigation legend. <br />DEA will coordinate with the local Water Department for review and approval. Effective January 2010, the State <br />of California implemented a new water ordinance (Assembly Bill 1881) and therefore many new requirements <br />are being requested from both the State and local agencies. We anticipate providing the following information: <br />■ Prepare water usage calculations (MAWA and ETWU) based on the new water ordinance. <br />■ Provide water efficient landscape worksheet and hydrozone table for each remote -control valve per new <br />ordinance. <br />■ Obtain horticultural soils report (Agronomic data) based on soil samples obtained from site by DEA. Report <br />to be provided by Soil and Plant Laboratory in Orange, CA. or equal. <br />■ Provide irrigation run time schedule per ordinance based on soil type. <br />■ Rain and wind sensors will be added per ordinance. <br />■ Add WUCOLS water use classifications for all plant material. <br />Task 17— Planting Plans <br />The planting plan will indicate location of proposed trees, shrubs, ground cover, turf and bioswale materials. <br />A planting legend will denote symbols, botanical and common names, size, quantities, and remarks. Planting <br />notes and details will also be included. <br />DEA understands the concern for water conservation and sustainability throughout the region and therefore <br />will select materials appropriate for the project. The plant palette established will be of drought tolerant species <br />with a focus on materials proven successful within surrounding areas. <br />Task 18 — Plan Submittals / Revisions <br />DEA will submit construction plans for review by the City and will make one "round" of corrections following <br />each review. <br />Task 19 — Project Specifications and Bid Schedule <br />Technical specifications will be prepared in the desired format for the proposed park development. These <br />technical specifications will be provided in a "boiler plate" format and DEA will modify the document <br />accordingly. DEA requests that the City provide the boiler plate information for general conditions, instructions <br />to bidders, and special provisions which DEA will use to provide projects specific sections. A complete bid list <br />of quantities will be provided indicating item descriptions and unit quantities. <br />Task 20 —Construction Cost Estimate <br />The DEA team will provide an estimate of probable construction costs for the proposed park elements for <br />each stage of preparation of the construction drawings (30%, 60%, and 90%). Changes will be made at each <br />new phase of development. A detailed, line item estimate will be prepared for use as a guide in the final <br />determination of items to be constructed under the allowed budget. <br />Phase III Bidding <br />Task 21 — Bid Assistance <br />The DEA team will attend the pre -bid meeting and assist the City in responding to bidder's inquiries and <br />request clarifications when needed. <br />Phase IV - Construction <br />Task 22 — RFI. Submittal. and Change Order Review <br />The DEA team will review and respond to RFI's and clarifications during construction within five calendar <br />days of receipt. DEA will also review contractor change order requests, answer questions, review submittals <br />David Evans and Associates, Inc. I March 15, 2023 1 13 <br />