My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID VOLZ DESIGN (3)
Clerk
>
Contracts / Agreements
>
D
>
DAVID VOLZ DESIGN (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:21:50 PM
Creation date
6/13/2023 8:26:27 AM
Metadata
Fields
Template:
Contracts
Company Name
DAVID VOLZ DESIGN
Contract #
A-2023-089-02
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
3/14/2025
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7 - City Staff Meetings <br />7.01 Four meetings with city staff <br />anticipated. <br />PHASETHREE DELIVERABLES+MEETINGS <br />Site layout plans and exhibits <br />Materials selection <br />Hydrology study <br />Updated rendering <br />Park Design Modification Plan <br />CEQA document <br />Staff meetings <br />Commission/Council meeting <br />PHASE FOUR: CONSTRUCTION DOCUMENT <br />DEVELOPMENT <br />Task 1 - Construction Documents Development <br />1.01 Schedule verification <br />1.02 Program review and verification <br />1.03 Prepare base maps <br />1.04 Prepare construction drawings <br />a. Final engineering report <br />b. Site construction plan and <br />details <br />c. Irrigation plan and details <br />d. Final landscape plan and details <br />e. Final cost projection <br />f. Construction document <br />1.05 Prepare technical specifications <br />1.06 Prepare construction cost budgets <br />1.07 Submittal/review at 60% documents <br />Task 2 - Final Construction Documents <br />2.01 City project team review of work -to - <br />date <br />2.02 Internal quality control review <br />2.03 Revise documents <br />2.04 Turnover of original plans and <br />specifications <br />PHASE FOUR: DELIVERABLES + MEETINGS <br />Construction plans <br />Construction technical specifications <br />Construction budget estimate <br />City staff services as needed <br />Staff meetings <br />SCOPE OF SERVICES <br />\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ <br />PHASE FIVE: BIDDING AND CONSTRUCTION <br />ASSISTANCE <br />Task 1 - Bidding Assistance <br />1.01 Provide answers to pertinent pre -bid <br />questions <br />1.02 Assist the city in evaluation of bids <br />Task 2 - Construction Assistance <br />2.01 Attend pre -construction meeting <br />2.02 Respond to project Requests for <br />Information (RFI's) <br />2.03 Attend pre -construction meeting <br />2.04 Participate in construction progress meetings <br />and prepare meeting summary notes <br />2.05 As -built plan preparation (contractor <br />annotation) <br />PHASE FIVE: DELIVERABLES + MEETINGS <br />Bidding assistance <br />RFI responses, instructions <br />Meeting summaries <br />As -built plan preparation <br />City staff support services <br />\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ <br />III \Tp ON -CALL LANDSCAPE ARCHITECT SERVICES, CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.