My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COLOR-AD, INC.
Clerk
>
Contracts / Agreements
>
C
>
COLOR-AD, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 7:44:24 AM
Creation date
6/16/2023 4:10:41 PM
Metadata
Fields
Template:
Contracts
Company Name
COLOR-AD, INC.
Contract #
A-2023-095
Agency
Parks, Recreation, & Community Services
Council Approval Date
6/6/2023
Expiration Date
6/6/2026
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILED FINAL DESIGN <br />In the Detailed Final Design phase "The CAD Team" will work closely with the EcoCenter project team <br />to evolve the Schematic Design established in the previous phase. The work of this phase is based on <br />the design scope developed to date and is targeted to explore all of the exhibit design features of the <br />project. The design documentation is a smooth evolution from the schematic vision. Through design <br />development we will explore each part of the design (exhibits, graphics & media). The design details <br />of this phase are an important part of the process since they must reflect the project budget as the <br />basis for the technical detailing and the fabrication phase. <br />PRODUCTION TRANSITION <br />During the pre -production stage, when the project transitions from design to fabrication, our project <br />manager begins the process of organizing the fabrication execution plan and assigning tasks to our <br />in-house team. The project manager conducts an internal production meeting with in-house key <br />personnel and project support staff. This pre -production meeting serves to familiarize the production <br />team with the project, define the type and scope of the work for each department, review the <br />assigned responsibilities, analyze the project scope of work matrix along side the preliminary project <br />schedule, assess the estimates for each aspect of the project, organize the scheduling for materials <br />and production, review quality control responsibilities throughout the production process, and assign <br />action items for each individual on the project team. The ultimate objective is to walk out of the <br />meeting armed with a clear plan to move each scope in the project forward. <br />EXHIBIT FABRICATION <br />1. Fabrication Submittals <br />We will go through a series of submittals and approvals to determine crucial details for each work <br />package before we begin production/fabrication. The due dates and specific deliverables for each <br />submittal will be refined with the EcoCenter team throughout the design stage. This stage in the <br />project is where the EcoCenter team will have the opportunity to ensure that Color -Ad builds the <br />exhibits that have been envisioned. <br />We will guide the EcoCenter team through the process by pointing out the areas in each work package <br />where we will need further clarification on what you want and also provide the EcoCenter team an <br />opportunity to make adjustments, corrections, and comments on any of the work packages we plan <br />to produce. <br />Submittals will include: <br />► Shop drawings <br />► Catalog cut sheets <br />► Color and material samples <br />► Graphic proofs <br />► Graphic production samples <br />► AV technical drawings <br />PR& .. <br />29 Reich&Petch SIGNS AND EXHIBITS <br />
The URL can be used to link to this page
Your browser does not support the video tag.