My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN (6)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:02:52 PM
Creation date
6/26/2023 3:42:30 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN
Contract #
A-2023-088-01
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -Call Engineering Services RFP No. 23-030 4 <br />City of Santa Ana, South Main Street Corridor Improvements Santa Ana. CA <br />Kimley-Horn was selected by the City of Santa Ana to help <br />transform the existing South Main Street into a revitalized <br />corridor. The project involved creating solutions for the <br />following issues: street beautification, traffic safety, walkability, <br />bike circulation, environmental sustainability, security, and <br />neighborhood amenities. Specific goals for the project were: <br />re -branding the South Main Street Business District with a <br />consistent theme to promote the neighborhood for future <br />developments; enhancing streetscape aesthetics with <br />- <br />landscape and hardscape features to create a more inviting <br />and pleasant urban area; improving street walkable paths with <br />pedestrian safety, curb ramps, crosswalks, and other ADA all AMA <br />features; encouraging the use of alternative transportation such as walking, biking, and public transit; <br />improving accessibility to local businesses by providing on street parking; creating a low impact and <br />sustainable design for improvements while considering environmental issues; and enhancing corridor <br />safety and security by adding high visibility crosswalks and pedestrian level street lights. <br />Key Staff: Darren Adrian, Othman Elmezain and Jason Melchor <br />Client: Sean Thomas, City of Santa Ana 1714.647.5655 1 sthomas5(a)Santa-ana.org <br />Dates: 2017 — 2021 <br />City of Santa Ana, Santa Ana Boulevard & 5th Street Protected Bike Lane PS&E Santa Ana CA <br />Kimley-Horn provided engineering design services for Santa <br />Ana Boulevard and 5th Street protected bike project in the <br />City of Santa Ana. The project included two and half miles <br />of protected bike lane facilities along various streets in the <br />City's downtown area. This project is one of first protected <br />bike lane projects of this magnitude in Orange County. The <br />project consisted of bike signals, pedestrian walkway <br />improvements, traffic calming features, ADA improvements, <br />signing and striping, and landscape and irrigation design. <br />The project has involved extensive coordination during the <br />design phase with all stakeholders including the Orange <br />County Transportation Authority for the OC Streetcar project <br />within the same area. The Kimley-Horn team provided the <br />City with alternatives for the design of the bike lanes to provide more protection for all modes of <br />transportation including vehicular, pedestrian, and public transit. <br />Key Staff: Gyan Sinha, Jason Melchor, Darren Adrian and Michael Madsen <br />Client: Sean Thomas, City of Santa Ana 1714.571.4241 1 sthomas5ta'�santa-ana.ora <br />Dates: 2017 — 2022 <br />Kimley*Horn 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.