My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH (3)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 4:12:53 PM
Creation date
6/26/2023 3:49:13 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH
Contract #
A-2023-088-02
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR <br />RFP NO.. 23-030 <br />CITY'S POTENTIAL GOALS, <br />OBJECTIVES & REQUIREMENTS <br />SCHEDULE <br />allp arYifiYllilrl <br />QUALITY <br />INNOVATION <br />EMY E C EI <br />SUSTAINABILITY <br />REVISIONS 73 <br />SANTA ANA <br />IN <br />TETRA TECH <br />the Work Plan will vary with the type and size of the <br />given task order. For small projects the Work Plan <br />may be a short memorandum which is distributed <br />by email to the members of the project team. No <br />internal kick-off meeting will be required for smaller <br />projects. For larger projects, the Work Plan will be <br />a comprehensive document which is distributed <br />and discussed at an internal kick-off meeting. The <br />kick-off meeting will include all key project team <br />members. The input of engineers and specialists of <br />other disciplines may be required in order to provide <br />comprehensive solutions to some of the tasks. Tetra <br />Tech has experienced staff in all required disciplines <br />who will address any situation that comes up. <br />Task Order Authorization: Upon receipt of the notice <br />to proceed from the City of Santa Ana for a given <br />Task Order, Tetra Tech will schedule a project kick- <br />off meeting or teleconference, update the Quality <br />Control Plan (as necessary), and prepare a Health <br />and Safety Plan (if required). <br />Project Execution: The last and most important <br />component of the management process is to perform <br />the work. This component is not easily summarized <br />here because it is dependent on the type of work <br />required and the scope of work for each Task Order. <br />FINAL PROJECT <br />WORK PLAN <br />However, to provide the City of Santa Ana with a <br />sense of our knowledge of project requirements for <br />the general types of projects expected under this <br />contract, we discuss our project understanding in the <br />next section. <br />DESIGN APPROACH AND <br />COORDINATION WITH THE CITY <br />The approach that Tetra Tech typically uses for <br />engineering design includes a preliminary design <br />phase and a final design phase. Prior to commencing <br />the preliminary design phase, Tetra Tech will lead <br />with support from the City a project kickoff meeting <br />to review the project in detail, discuss the project <br />approach, identify critical success factors, schedule, <br />budget and obtain project specific goals from the <br />City. During the preliminary design phase, the <br />Tetra Tech team will work toward understanding <br />the project and site location. The team will analyze <br />project design issues and base their design <br />recommendations to the City of Santa Ana on this <br />analysis. Lastly, the team will work with the City to <br />set a design course that will result in a 30% design <br />review package. <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.