My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH (3)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 4:12:53 PM
Creation date
6/26/2023 3:49:13 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH
Contract #
A-2023-088-02
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
10/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be done to a level to verify that the bids satisfy the <br />bid requirements. Following this review, our team will <br />make an award recommendation to the City. <br />Review of Construction Contracts: Clearly the <br />review of construction contracts and the evaluation of <br />construction project bids is of key importance for the <br />management of construction project costs. Tetra Tech <br />will assist in the review of bids, bid qualifications, <br />and proposed contract language exceptions during <br />the construction contractor selection process. At the <br />conclusion of the process, Tetra Tech will provide the <br />City with our recommendation for award. <br />CONSTRUCTION ENGINEERING <br />SUPPORT SERVICES <br />If needed, during construction, Tetra Tech will <br />provide engineering services including review <br />of RFIs (Request for Information), shop drawing <br />review, material certifications, review of contractor <br />substitutions, schedule reviews and assistance with <br />change orders. <br />Tetra Tech's team of engineers understand the <br />importance of services during construction and is <br />committed to providing timely and accurate review <br />of all submittals. We pride ourselves in being able <br />to solve complex field issues quickly and find cost- <br />effective solutions to keep the project moving ahead <br />without delays and cost overruns. <br />Submittals for Project Design by Contractor <br />Personnel: Our team will review project design <br />submittals provided by the contractor. They will <br />be reviewed for conformance with the contract <br />documents. Substitutions will be carefully reviewed <br />to determine if they are equal to the specified <br />materials. We will also review any substitution to see <br />if it changes any other part of the existing design. <br />Our analysis will include our opinion of the benefit to <br />the City of Santa Ana of the proposed substitution <br />and validity of any proposed cost savings. We will <br />keep in mind the overall desires of the City of Santa <br />Ana operating staff in our analysis. <br />Review of Technical Submittals: Our project <br />team will review contractor technical submittals <br />including, but not limited to, shop drawings, material <br />certifications, material samples and schedules, <br />as requested by the City. Shop drawings will be <br />reviewed for general conformance with the plans and <br />specifications. Each submittal or shop drawing will be <br />reviewed and returned to the City, stamped with our <br />shop drawing stamp and marked accordingly. <br />On -Call Engineering Services <br />Our team of construction management personnel are <br />qualified professionals who can effectively manage <br />the technical complexities of today's construction <br />projects. Our construction management philosophy <br />is to keep the project on schedule and on budget <br />through communication and project controls. <br />As -Built Records: Upon completion of a <br />construction contract, Tetra Tech will prepare record <br />drawings by updating the original project plan sheets <br />showing changes that occurred during bidding and <br />construction. Record drawings will be prepared by <br />transferring the updates from red marked plans <br />received from the City. The record drawings will be <br />completed in the project AutoCAD files. "Record <br />Drawing" cells will be included on each plan sheet <br />and updates will be clouded to provide distinction <br />from the original design. <br />PROJECT MANAGEMENT TEAM'S <br />QUALIFICATION & EXPERIENCE <br />NARRATIVE <br />For this contract, we are proposing our water, <br />wastewater and civil design team with recent <br />experience working with municipalities under on -call <br />contracts on a variety of water, wastewater and civil <br />design task orders. Our proposed Project Manager, <br />Tom Epperson, will be supported by a deep and <br />strong team of civil engineers and designers, all of <br />whom are available and capable to successfully <br />deliver task orders. <br />Tom and the leadership team's experience providing <br />oversight and management of multiple ongoing <br />projects under on -call contracts along with the Tetra <br />Tech team, virtually eliminates learning curves <br />associated with team's that have multiple firm <br />subconsultants. It provides the City of Santa Ana with <br />a team that will be proactive, understands the issues <br />and challenges associated with contracts of this <br />nature and who can hit the ground running on any <br />task order needs. <br />Our proximity to the City further solidifies our <br />investment in the City and this contract. We are in <br />local and have been for more than 54 years. <br />In our Statement of Qualifications Section C. Firm <br />and Team Experience, detailed project examples <br />illustrate our firm's ability to successfully provide <br />services that may be needed under this City of Santa <br />Ana contract. <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.