My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 9:41:17 AM
Creation date
6/26/2023 3:50:56 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT ZOLLARS, INC.
Contract #
A-2023-088-03
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huift-Zollars reviewed the RFP and provides the following as a supplemental sample scope of services. Design plans and reports would <br />follow the City's standard format. <br />TA S K A: Project Management and Coordination • After contract award HZ will prepare a Project Work Plan (PWP) and schedule a <br />kick-off meeting. The PWP will be provided to the City for review and comment prior to the kick-off meeting date. Said PWP will expand <br />on: <br />» Design Team (City of Santa Ana/HZ/Consultants) <br />» CADD Standards <br />» Scope of Work/Deliverables <br />» Drawing List <br />» Applicable Criteria/Standards/Codes <br />» Specification Requirements <br />» Schedule/Milestones <br />» Design Budget(s) <br />» Quality Control/Quality Assurance <br />» Value Engineering (Construction Budgets) <br />During the kick-off meeting the development team will review the PWP, identify key staff, and establish lines of communication. The PWP <br />will be updated per comments provided during the kick-off meeting and publish with the City's approval. The published PWP will be used <br />by the project manager to monitor the project during design. <br />Starting from the date of kick-off meeting, Huitt-Zollars will be responsible for project management and coordination of the project. This <br />includes: <br />» Development team meetings between the City of Santa Ana and consulting team <br />» Meetings with affected community members, stakeholders, and utility companies <br />Sample List: <br />City of Santa Ana (Water, Sewer, & Storm) <br />Orange County Sanitation District <br />Union Pacific Railroad <br />Southern California Edison <br />Southern California Gas <br />AT&T <br />Time Warner Cable <br />Santa Ana Unified School District <br />Preparation of progress reports to the City of Santa Ana <br />Monitoring the design elements and schedule per published PWP <br />Securing permits — HZ will coordinate with agencies involved in the project, <br />prepare, and file to acquire required permits on behalf of the City of Santa Ana. <br />TA S K B : Records Research — The utility list will be compared to findings from Underground Service Alert. All Utility agencies will be <br />contacted to gather and review available record data. Record information will be evaluated against the survey and compiled into a master <br />ViB CADD file. HZ will evaluate "record" information against proposed facilities to pinpoint potential conflicts. All potential conflicts will be <br />tagged for further investigation during the pothole investigation. <br />TASK C : Survey —The overall topography includes a design survey that captures surface information within the right-of-way and an <br />aerial that extends the topography beyond the right-of-way to capture private property features. It is assumed that the topography limits <br />will be sufficient for design. The City will also provide the record boundary that will be necessary to evaluate right-of-way and property <br />encroachments. <br />Prior to commencing design the project manager and key personnel will walk the site to evaluate the topography and record information <br />against the existing condition. HZ will review the topography against visible utility features, notate SCE power pole number tags, control <br />panel types, traffic signal types, and mast arm lengths. The information will be compile into the master Micro -Station CAD file for <br />discussion prior to the design phase. <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.