My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 9:41:17 AM
Creation date
6/26/2023 3:50:56 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT ZOLLARS, INC.
Contract #
A-2023-088-03
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oxnard Village is an approximately 60-acre privately funded re development <br />project located at the westerly gateway to the City of Oxnard, along the <br />101 Freeway. The under-utilized site contained 1950's era motel, mobile <br />home park, retail/commercial and light manufacturing uses. This mixed <br />use project will ultimately include 1,500 residential units with row -houses, <br />podium stacked flats, live -work units and luxury high rise condominiums and <br />luxury hotels. Four parking lots have already been designed which included <br />aesthetic, decorative lighting, water quality, space, enhanced paving, <br />vehicular, pedestrian and disabled access, as well as drainage challenges. <br />In each case, both a functional and aesthetically pleasing built environment <br />resulted. The project is ongoing and will continue development while serving <br />the City of Oxnard for many decades into the future. <br />RELEVANT DESIGN COMPONENTS: <br />Street Improvements <br />Sewer, Domestic Water <br />Reclaimed Water <br />Storm Drain <br />Flood Control <br />Mulitple Parking Lots <br />Landscaping <br />Water Quality <br />Vehicular & Disabled Access <br />CLIENT CONTACT: <br />Oxnard CRFL Partners <br />Carl Renezeder <br />carlr@oakwooddev.com <br />64 Maxwell <br />Irvine, CA92618 <br />949.719.9040 <br />Fehr & Peers guided the City of Santa Ana through the process <br />of updating and adopting the City's traffic impact study guidelines <br />consistent with requirements of SB 743. Fehr & Peers made <br />VMT estimates for the entire Orange County region in support of <br />the recommended thresholds of significance, including screening <br />maps to facilitate City processing of projects. Fehr & Peers also <br />provided a guidance document with sample projects to assist the <br />City with implementation. This effort included education of staff and <br />collaborative meetings to meet City goals. The City VMT thresholds <br />and TIA Guidelines have been adopted by the Santa Ana City Council. This project was delivered on budget and <br />on schedule, within the July 2020 adoption deadline. <br />CLIENT CONTACT: <br />City of Santa Ana <br />Zdenek "Zed" Kekula <br />Senior Civil Engineer <br />zkekula@santa•ana.org <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />7114.647.5606 <br />City of Santa Ana Civil Engineering Services. RFP 23-030 <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.