My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (2)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:19 PM
Creation date
6/26/2023 3:54:33 PM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2023-088-05
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
7/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
» Monitoring design activities and delivery schedules through a committed Quality Assurance/Quality <br />Control process <br />» Providing direction on the most beneficial and cost-effective task order solutions <br />Mark Thomas has developed the following general approach to a street and/or active transportation <br />PS&E task order. Ultimately, each task order is completed with a tailored approach according to the City's <br />specific needs, budget, and schedule. For projects with State and/or Federal funding, Mark Thomas will <br />assist the City in the administration and processing of the necessary documents with Caltrans Local <br />Assistance, including right-of-way certifications and Requests for Authorization. <br />,;I`ROJECT MANAGEMENT AND ADMINISTRATION <br />Mark Thomas will gather readily accessible information on the <br />project and will conduct a detailed project site visit during our scope <br />development process where applicable. This will confirm our project <br />understanding and help us answer key technical questions, even <br />before task order notice to proceed (NTP) is received. We will drive <br />the project schedule, evaluate and monitor budgets, perform quality <br />control, conduct project meetings including agendas, exhibits and <br />meeting minutes. <br />BASELINE REVIEW AND PROJECT DEFINITION <br />Our team will conduct a detailed walk audit of the project site, <br />identifying existing conditions and deficiencies related to pavement <br />condition, curb, gutter and sidewalk conditions, ADA compliance and <br />other elements that may affect the proposed project. Survey and <br />mapping will be conducted to provide a project basemap. Other site - <br />specific information will be obtained, including as-builts and facility <br />maps from pertinent agencies and utility owners (utility "A" letter <br />request). <br />KEY DELIVERABLES <br />» Agendas & Minutes <br />» Progress Reports <br />» Schedule Updates <br />Quality Control & Audit <br />KEY DELIVERABLES <br />» Site Audit <br />» As -Built Plans <br />» Utility "A" Letters <br />» Survey & Mapping <br />CONCEPT/PRELIMINARY DESIGN DEVELOPMENT <br />Early pre -concept design identification of constraints provides us with <br />flexibility, allowing for more time to mitigate risks and incorporate cost- <br />effective solutions in the project. Mark Thomas will include preliminary <br />design tasks in the scope of work for the project. We will analyze <br />alternatives to determine their relative impacts and prepare preliminary <br />construction cost estimates to assist the City in evaluating each <br />alternative. <br />For each alternative, if needed, we will identify the right-of-way impacts <br />and address the required CEQA and NEPA (if necessary due to <br />funding) environmental clearance and documentation for the project. <br />With the alternative set, additional studies will be performed including <br />geotechnical, stormwater WQMP, and potholing (if necessary). <br />KEY DELIVERABLES <br />» Preliminary Plans (30%) <br />» Cost Estimate <br />» ROW and Utility <br />Impacts <br />» Environmental <br />Clearance <br />» Geotechnical Report <br />» WQMP <br />» Potholing, if necessary <br />ON -CALL ENGINEERING SERVICES <br />City of Santa Ana <br />MARKTHOMAS <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.